Decision Letter - Change to an Existing Approval - 010.2004.00004386.002 [As Published] · 152004.4386.02
2004/4386
11. A payment of $4729 shall be made (prior to Council endorsement of the Plan of Survey)
toward future construction of Kerb & Channel including any associated and ancillary work for
the full length of the frontage of the development site. This amount will be subject to variations
in the Consumer Price Index, All Groups Brisbane from June 2004 until the date of payment.
12. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
Avocet Parade frontage of the site in accordance with Planning Scheme Policy PSP1
Landscaping Guidelines. Grass shall be couch, free of weeds.
13. A payment of $2481 shall be made (prior to Council endorsement of the Plan of Survey)
toward the future construction of a 1.2 metre wide concrete path along the full length of the
frontage of the development site. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from June 2004 until the date of payment.
Vehicular Access
14. A 3.0 metre wide concrete driveway shall be constructed within a 4.5 metre wide battleaxe
access strip. All service conduits shall be installed for the full length of the access strip prior to
pavement construction.
Stormwater
15. The applicant shall address stormwater runoff from the upper properties in a manner that does
not adversely affect other properties and the proposed development. The applicant shall
provide pipelines and/or free of obstruction secondary overland flow-path(s) to cater for
stormwater flows affecting the south and west boundaries of the property for all storm events
up to and including a 1 in 100 years Average Return Interval (ARI). Design plans shall be
submitted to Council for approval prior to obtaining a Development Permit for Operational
Works.
16. Where drainage pipelines, sewer and water connections were encroaching onto another
property dedication of inter-allotment easement of a minimum width of 1.5 metres would be
required.
17. All site drainage shall be by means of gravity with pipe grades not less than 1%.
18. The internal drainage pipelines shall cater for 1 in 5 year ARI with provision of a well defined
and free of obstruction overland Secondary Flow Path to cater for storms events up to and
including 1 in 100 years ARI.
19. The stormwater runoff from the access driveway should reach the road level in a controlled
manner and be directed to the nearest stormwater inlet pit ensuring the opposite properties will
not be affected by this runoff particularly during major storms.
Services
20. The site shall be connected to Council’s Water Supply and Sewerage reticulation systems to
the water and Sewerage design guidelines and the requirements of the Manager - Land
Development, at no cost to Council.
21. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
22. Any alteration of a public utility or other facility necessitated by the development of the land or
associated construction works either internal or external to the site shall be at no cost to
Council.
23. An underground electricity service shall be provided to each lot if not already provided.
In this regard, an approved ENERGEX Electrical Design Consultant shall work in conjunction
with Council’s Manager - Works Support to prepare detailed designs of the electrical proposal.
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2004.00004386.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 65 KB (small file)
- File type
No other editions are linked here.