Decision Notice - 010.2008.00000831.001 [As Published] · 142008.831
2008/831
M3087 – C06 D Stormwater Longitudinal Sections & 19/8/08
Details – Barlow Gregg
BM003087 – 00 F Basement Slab Relief Drainage System 19/8/08
– 03 Layout – Barlow Gregg
BM003087 – B C Basement Footing Details Sheet 2 – 15/7/08
– 04 Barlow Gregg
W-02-02 O Ground Floor Plan – CORE 28.07.07
Architecture
W-01-01 H Site Plan – CORE Architecture 28.07.07
12. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below:
12.1 A single nominated access location to and from the site.
12.2 The plan should detail the routing of trucks to and from the site.
12.3 Provision of onsite parking for personnel working on this development, as
there is limited parking available in adjacent streets.
12.4 Provision of safe cycle and pedestrian movements in the vicinity of the
development along David Low Way.
12.5 No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
12.6 Provision of signage and traffic controllers in accordance with Manual of
Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act.
12.7 Provide an indication where the surplus spoil is to be transported to.
13. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of
50mm below the level of the adjacent top of kerb. All landscaping is to be constructed in
accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
14. Suitable root barriers shall be installed where proposed trees are adjacent to paths, pavement,
etc, in accordance with Council’s Planning Scheme Policy PSP03 Landscaping Plants and
Guidelines.
15. The pipe class for stormwater drainage line 3/2 to EX/2 shall be “Class 2”. (Drawing M3087-
C05-F refers).
16. Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
17. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
18. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000831.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 72 KB (small file)
- File type
No other editions are linked here.