Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)
downstream; or adversely affecting
the flow of water in any overland
flow path. Environment and
heritage Table 6.5.2.3 Criteria for
assessment. (part) Performance
outcomes Acceptable Outcomes All
activities Environment and heritage
PO30 AO30.1, AO30.2
Complies with PO
Development: Performance Development does not result in
The proposal has no material impact on
outcomes (a) has minimal impact on sediment or other material
the natural landform. The site is
the natural landform of the site; (b) Acceptable Outcomes including
developed, sealed and generally flat. No
does not lead to erosion or the building materials or waste
bulk earthworks are proposed. Localised
transport of sediments off site; and products being deposited or
surface works are proposed at the
buildings or structures of cultural released into the road reserve,
frontage in connection with the accessible
heritage significance. stormwater drain or adjacent
parking space and shared area, bollard
properties.
footings and a new garden bed. These are
AO30.2 Development on a site
shallow, do not create batters or retaining
adjoining a local heritage place
structures, and do not lead to erosion or
respects the cultural heritage
alter drainage patterns.
significance of the place by
mitigating any adverse impacts on
the setting or integrity of the
heritage values. Heritage and
Character Areas Overlay Maps in
Schedule 2.
PO31 No acceptable outcome provided
Complies with PO
Industry and business activities are
The display and sale of motor vehicles
conducted in an No acceptable
within an enclosed building is conducted
outcome provided environmentally
in an environmentally responsible
responsible manner, operating
manner and involves no industrial
without deleterious impacts on
process, no chemical storage and no
immediate, surrounding or
discharge.
downstream communities,
environments or environmental
processes.
PO32 No acceptable outcome provided
Complies with PO
The storage of materials onsite does
No materials are stored on site externally.
not cause a public health No
No public health hazard or environmental
acceptable outcome provided.
harm arises from the storage of display
hazard or environmental nuisance.
vehicles within the building.
Infrastructure Table 6.5.2.3 Criteria
for assessment. (part) Performance
outcomes Acceptable Outcomes All
activities Infrastructure
PO33 AO33
Complies with AO
Development is supported by Development is connected to
The site is fully serviced with reticulated
adequate infrastructure and urban reticulated water supply, sewerage
water, sewerage, electricity,
services including reticulated water, and electricity infrastructure
telecommunications and existing
sewerage, stormwater drainage, networks.
stormwater infrastructure. The proposal is
sealed roads, pathways, electricity
a change of use within an existing
and telecommunication
building and requires no augmentation of
infrastructure.
any network.
PO34 No acceptable outcome provided
Complies with PO
Development does not adversely
The proposal does not adversely affect the
impact on the continued No
continued operation or viability of
acceptable outcome provided
surrounding industrial uses. It generates
operation, viability and
no emissions, no industrial traffic and no
maintenance of existing
infrastructure or compromise the
See the original