minimise bulk earthworks. (a) (b)           underpasses, ropes, fencing and the
                                                                                     can be provided in response to an
(c)                                         like.
                                                                                     information request.
                                            AO12.4 Road infrastructure within
                                            or adjacent to native habitat
                                            incorporates fences which allow for
                                            protected wild

PO13                                        AO13
                                                                                     Complies with PO
Road infrastructure is constructed          Road infrastructure is constructed
                                                                                     Traffic generation is lower than that of
to minimise adverse environmental           in accordance with Council’s
                                                                                     the lawful industry and bulk storage use
impacts, including from run­off and         Planning Scheme Policy PSP6
                                                                                     of the site. The use operates by
erosion. Performance outcomes               Engineering Design Standards –
                                                                                     appointment only, producing dispersed
External Works and Infrastructure           Acceptable Outcomes Roads,
                                                                                     and intermittent movements rather than
Table 9.4.7.3 Criteria for assessable       drainage and earthworks
                                                                                     continuous trade or shift-based industrial
development (part) Performance              Acceptable Outcomes
                                                                                     traffic. Access is from the Eenie Creek
outcomes External Works and
                                                                                     Service Road rather than the through
Infrastructure
                                                                                     carriageway, and the existing crossover is
                                                                                     unchanged. The road hierarchy is
                                                                                     respected and the through traffic function
                                                                                     of Eenie Creek Road is not compromised.
                                                                                     No traffic impact assessment is considered
                                                                                     necessary; should Council require one it
                                                                                     can be provided in response to an
                                                                                     information request.

PO14                                        AO14
                                                                                     Complies with PO
Development is provided with                Where not already existing, the
                                                                                     Traffic generation is lower than that of
external works— (a) along the full          following infrastructure
                                                                                     the lawful industry and bulk storage use
extent of the frontage of the site to       components are provided at the
                                                                                     of the site. The use operates by
an appropriate standard having              frontage of the site— full width
                                                                                     appointment only, producing dispersed
regard to the specified (a) function        sealed road; concrete kerb and
                                                                                     and intermittent movements rather than
of the road; and (b) (b) provided           channel where appropriate; forming
                                                                                     continuous trade or shift-based industrial
beyond the site’s frontage if               and grading to footpaths; vehicular
                                                                                     traffic. Access is from the Eenie Creek
required. (c) (d) (e) (f) (g) (h) (i) (j)   kerb and footpath crossings; a
                                                                                     Service Road rather than the through
(k)                                         constructed bikeway; a constructed
                                                                                     carriageway, and the existing crossover is
                                            footpath; a constructed
                                                                                     unchanged. The road hierarchy is
                                            carriageway; required alterations to
                                                                                     respected and the through traffic function
                                            public utility mains, services or
                                                                                     of Eenie Creek Road is not compromised.
                                            installations; construction of any
                                                                                     No traffic impact assessment is considered
                                            required alterations to public utility
                                                                                     necessary; should Council require one it
                                            mains, services or installations;
                                                                                     can be provided in response to an
                                            stormwater drainage works; and
                                                                                     information request.
                                            installation of electrical conduits.

PO15                                        No acceptable outcome provided
                                                                                     Complies with PO
Any alterations or repairs to
                                                                                     Traffic generation is lower than that of
infrastructure as a result of the No
                                                                                     the lawful industry and bulk storage use
acceptable outcome provided
                                                                                     of the site. The use operates by
development are made at no cost to
                                                                                     appointment only, producing dispersed
Council.
                                                                                     and intermittent movements rather than
                                                                                     continuous trade or shift-based industrial
                                                                                     traffic. Access is from the Eenie Creek
                                                                                     Service Road rather than the through
                                                                                     carriageway, and the existing crossover is
                                                                                     unchanged. The road hierarchy is
                                                                                     respected and the through traffic function
                                                                                     of Eenie Creek Road is not compromised.
                                                                                     No traffic impact assessment is considered
                                                                                     necessary; should Council require one it
                                                                                     can be provided in response to an
                                                                                     information request.
Log in to download the original file

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.