Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)

of 64

Page text shows just the words. Original shows the document exactly as it was published.

PO16                                   No acceptable outcome provided
                                                                        Complies with PO
Road infrastructure is proven to be
                                                                        Traffic generation is lower than that of
suitable for its use prior to No
                                                                        the lawful industry and bulk storage use
acceptable outcome provided
                                                                        of the site. The use operates by
Council accepting the dedicated
                                                                        appointment only, producing dispersed
asset. Staged development Table
                                                                        and intermittent movements rather than
9.4.7.3 Criteria for assessable
                                                                        continuous trade or shift-based industrial
development (part) Performance
                                                                        traffic. Access is from the Eenie Creek
outcomes Acceptable Outcomes
                                                                        Service Road rather than the through
Staged development
                                                                        carriageway, and the existing crossover is
                                                                        unchanged. The road hierarchy is
                                                                        respected and the through traffic function
                                                                        of Eenie Creek Road is not compromised.
                                                                        No traffic impact assessment is considered
                                                                        necessary; should Council require one it
                                                                        can be provided in response to an
                                                                        information request.

PO17                                   No acceptable outcome provided
                                                                        Complies with PO
Staged development is planned,
                                                                        Traffic generation is lower than that of
designed and constructed to No
                                                                        the lawful industry and bulk storage use
acceptable outcome provided
                                                                        of the site. The use operates by
ensure that— (a) each stage of the
                                                                        appointment only, producing dispersed
development can be constructed
                                                                        and intermittent movements rather than
without interruption to services and
                                                                        continuous trade or shift-based industrial
utilities provided to the previous
                                                                        traffic. Access is from the Eenie Creek
stages; (b) the infrastructure
                                                                        Service Road rather than the through
provided is capable of servicing the
                                                                        carriageway, and the existing crossover is
entire development; and (c) the
                                                                        unchanged. The road hierarchy is
materials used are consistent
                                                                        respected and the through traffic function
throughout the development. 9.4.8
                                                                        of Eenie Creek Road is not compromised.
Water Quality and Drainage Code
                                                                        No traffic impact assessment is considered
                                                                        necessary; should Council require one it
                                                                        can be provided in response to an
                                                                        information request.
Log in to download the original file

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.