Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT)

of 64

Page text shows just the words. Original shows the document exactly as it was published.

11        NOOSA PLAN 2020, SECTION 9.4.8



          Water Quality and Drainage Code
Applies because: Works code named as a benchmark in Table 5.5.10.
The proposal is an internal fit-out of an existing building together with a new frontage treatment on a
developed, fully serviced and generally flat site. The outcomes of this code are addressed on that basis.

 Performance Outcome                      Acceptable Outcome                    Response

 PO1                                      AO1
                                                                                 Complies with PO
 The development and its                  A stormwater management plan is
                                                                                 The site is presently developed and
 stormwater management system is          prepared consistent with PSP6
                                                                                 sealed, and stormwater discharges to the
 planned and designed having              Engineering Design Standards ­
                                                                                 existing lawful point of discharge. The
 regard to: (a) the natural features of   Roads, drainage and earthworks.
                                                                                 proposal does not materially alter the
 the site; (b) the need to avoid
                                                                                 impervious area: the works are within the
 impacts and potential risks to
                                                                                 existing building footprint, and at the
 ecologically important areas; (c) the
                                                                                 frontage a new garden bed is introduced
 likely effectiveness of erosion and
                                                                                 while the existing frontage garden is
 sediment control and stormwater
                                                                                 removed, so the net change is minor. Any
 drainage measures during rainfall
                                                                                 regrading associated with the accessible
 events during and post
                                                                                 parking space is localised and will
 construction; and (d) the need to
                                                                                 maintain existing drainage patterns and
 protect environmental values and
                                                                                 the existing point of discharge. No change
 water quality of receiving waters
                                                                                 to the stormwater management system is
 both during and post construction.
                                                                                 proposed. Confirmation of finished
                                                                                 surface treatment is a matter for detailed
                                                                                 design and is capable of being
                                                                                 conditioned.

 PO2                                      AO2.1, AO2.2
                                                                                 Complies with PO
 Stormwater drainage infrastructure       Stormwater drainage planning,
                                                                                 The site is presently developed and
 is planned, designed and                 design and construction is in
                                                                                 sealed, and stormwater discharges to the
 Performance Outcomes Acceptable          drainage and earthworks and the
                                                                                 existing lawful point of discharge. The
 Outcomes constructed to:                 latest version of the Queensland
                                                                                 proposal does not materially alter the
 accordance with PSP6 Engineering         Urban Drainage Design Manual.
                                                                                 impervious area: the works are within the
 Design Standards ­ Roads, (a)            AO2.2 stormwater drainage system
                                                                                 existing building footprint, and at the
 incorporate allowance for increased      connects to a lawful point of
                                                                                 frontage a new garden bed is introduced
 flood risk and tidal inundation          discharge in accordance with PSP6
                                                                                 while the existing frontage garden is
 through pipework as a result of          Engineering Design
                                                                                 removed, so the net change is minor. Any
 climate change and sea level rise;
                                                                                 regrading associated with the accessible
 The (c) ensure stormwater is
                                                                                 parking space is localised and will
 managed and lawfully discharged
                                                                                 maintain existing drainage patterns and
 without altering stormwater
                                                                                 the existing point of discharge. No change
 drainage characteristics external to
                                                                                 to the stormwater management system is
 the site. Standards ­ Roads, drainage
                                                                                 proposed. Confirmation of finished
 and earthworks. AO2.3 Stormwater
                                                                                 surface treatment is a matter for detailed
 flows discharging from the
                                                                                 design and is capable of being
 development are demonstrated to
                                                                                 conditioned.
 be consistent with pre­develo

 PO3                                      AO3.1
                                                                                 Complies with PO
 Stormwater drainage infrastructure       Stormwater drainage infrastructure
                                                                                 The site is presently developed and
 conveys run­off in a manner that         meets the desired standards of
                                                                                 sealed, and stormwater discharges to the
 allows roads to deliver desired          service for roads functionality set
                                                                                 existing lawful point of discharge. The
 standards of service appropriate to      out in PSP6 Engineering Design
                                                                                 proposal does not materially alter the
 the local conditions and local           Standards ­ Roads, Drainage and
                                                                                 impervious area: the works are within the
 stormwater drainage                      Earthworks.
                                                                                 existing building footprint, and at the
 characteristics.
                                                                                 frontage a new garden bed is introduced
                                                                                 while the existing frontage garden is
Log in to download the original file

Code Assessment - 12 Eenie Creek Rd (RESOLVED DRAFT).pdf · 527 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.