wherever practical and excavation                                               follows the natural land form and
or filling is minimal.                                                          will be carried out in accordance
                                                                                with the recommendation of the
                                                                                submitted Global Stability
                                                                                Assessment Report at Appendix B.

Infrastructure protection                No acceptable outcome provided         PO10 - Complies
PO10                                                                            The earthworks will not impact on
Earthworks and                                                                  infrastructure.
vehicular access do not adversely
impact on the capacity, operations
and maintenance of existing
infrastructure.

Environmental protection                 No acceptable outcome provided         PO11 - Complies
PO11                                                                            The earthworks will not impact on
Earthworks minimise any adverse                                                 groundwater, watercourses and
impact upon groundwater,                                                        native vegetation as demonstrated
watercourses, drainage lines,                                                   in the submitted Global Stability
wetlands, and native vegetation.                                                Assessment Report at Appendix B
                                                                                and Erosion and Sediment Control
                                                                                Plan at Appendix D.

Water Quality and Drainage Code
Performance Outcomes                     Acceptable Outcomes                    Compliance
Stormwater drainage design               AO1                                    PO1 - Performance Outcome
PO1                                      A stormwater management plan is        The earthworks have been
The development and its                  prepared consistent with PSP6          managed in accordance with an
stormwater management system is          Engineering Design Standards -         Erosion and Sediment Control Plan
planned and designed having              Roads, drainage and earthworks.        so as to not cause erosion or
regard to:                                                                      sedimentation downstream and
  a) the natural features of the site;                                          protect environmental values.
  b) the need to avoid impacts
      and potential risks
      to ecologically important
      areas;
  c) the likely effectiveness of
      erosion and sediment control
      and stormwater drainage
      measures during rainfall
      events during and post
      construction; and
  d) the need to protect
      environmental values and
      water quality of receiving
      waters both during and post
      construction.

Construction and establishment           AO14.1                                 AO14.1 - Complies
of stormwater management                 An erosion and sediment control plan   The earthworks have been carried
systems                                  prepared in accordance with the        out and monitored in accordance
PO14                                     International Erosion Control          with an Erosion and Sediment
Construction methods provide for         Association Best Practice Books        Control Plan at Appendix D
appropriate controls to avoid entry      demonstrates that the capture and      prepared by Aussie Environmental
and transport of litter, sediment, and   release of stormwater achieves the     at Appendix D.
associated prescribed water              design objectives listed in Table A:
contaminants into receiving waters.      Construction phase – stormwater
                                         management design objectives of the
                                         State Planning Policy (Appendix 2).


                                                                                                       Page 11 of 13
Log in to download the original file

Town Planning Assessment Report.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.