Town Planning Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
wherever practical and excavation follows the natural land form and
or filling is minimal. will be carried out in accordance
with the recommendation of the
submitted Global Stability
Assessment Report at Appendix B.
Infrastructure protection No acceptable outcome provided PO10 - Complies
PO10 The earthworks will not impact on
Earthworks and infrastructure.
vehicular access do not adversely
impact on the capacity, operations
and maintenance of existing
infrastructure.
Environmental protection No acceptable outcome provided PO11 - Complies
PO11 The earthworks will not impact on
Earthworks minimise any adverse groundwater, watercourses and
impact upon groundwater, native vegetation as demonstrated
watercourses, drainage lines, in the submitted Global Stability
wetlands, and native vegetation. Assessment Report at Appendix B
and Erosion and Sediment Control
Plan at Appendix D.
Water Quality and Drainage Code
Performance Outcomes Acceptable Outcomes Compliance
Stormwater drainage design AO1 PO1 - Performance Outcome
PO1 A stormwater management plan is The earthworks have been
The development and its prepared consistent with PSP6 managed in accordance with an
stormwater management system is Engineering Design Standards - Erosion and Sediment Control Plan
planned and designed having Roads, drainage and earthworks. so as to not cause erosion or
regard to: sedimentation downstream and
a) the natural features of the site; protect environmental values.
b) the need to avoid impacts
and potential risks
to ecologically important
areas;
c) the likely effectiveness of
erosion and sediment control
and stormwater drainage
measures during rainfall
events during and post
construction; and
d) the need to protect
environmental values and
water quality of receiving
waters both during and post
construction.
Construction and establishment AO14.1 AO14.1 - Complies
of stormwater management An erosion and sediment control plan The earthworks have been carried
systems prepared in accordance with the out and monitored in accordance
PO14 International Erosion Control with an Erosion and Sediment
Construction methods provide for Association Best Practice Books Control Plan at Appendix D
appropriate controls to avoid entry demonstrates that the capture and prepared by Aussie Environmental
and transport of litter, sediment, and release of stormwater achieves the at Appendix D.
associated prescribed water design objectives listed in Table A:
contaminants into receiving waters. Construction phase – stormwater
management design objectives of the
State Planning Policy (Appendix 2).
Page 11 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.