Original source · versioned page text
Judgement - 11C Church Street
e. Protect and recover fauna during clearing operations (fauna not previously
removed).
f. Manage the translocation of animals and recovery procedures in accordance with
relevant legislation.
g. Undertake protection works for mulching of any stockpiled vegetation.
*(Refer to Advisory Note)
Removal of Existing Trees and Vegetation
5. Vegetation removal, felling and lopping must:
a. Retain old growth tree hollows and suitably relocate and distribute for nesting
fauna.
b. Mulch all other wood and leaf material (without root balls, soil or debris and
minimising weed seeds) for re-usable mulch.
c. Have mulch for re-use in landscape or rehabilitation stockpiled and aged for a
minimum of three months.
d. Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m
separation between piles.
e. Allow for existing endemic ground flora to be translocated to suitable landscaping
and rehabilitation areas.
f. Conclude with the area being stabilised against erosion.
*(Refer to Advisory Note)
PROPERTY NOTES:
MCU22/0031 – Bushfire Management
1. To ensure the safety of people and property on this property is maintained, all buildings
and structures must be sited and/or constructed in accordance with the bushfire
management conditions of Council Approval MCU22/0031 and associated Operational
Work approvals.
ADVISORY NOTES:
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code - Building Code of Australia (Volume
1) as they relate to people with disabilities. Your attention is also directed to the fact
that in addition to the requirements of the National Construction Code as they relate to
people with disabilities, one or more of the following may impact on the proposed
building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
2. Prior to the commencement of the use, please contact Council's Development
Assessment Branch to arrange a Development Compliance Inspection.
6463731_1
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.