Judgement - 11C Church Street
Site Access and Driveways
19. A sealed access driveway must be provided from Church Street to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular a driveway crossover
generally in accordance with Council’s Standard Drawings RS-051.
20. Suitable signage for traffic control must be provided at either side of the internal single
lane bridge. The signage must be clearly indicated on the plans submitted for operational
works approval.
Car Parking
21. A minimum of 31 car parking spaces must be provided on the site. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. Parking spaces within the garages must be made available to the related unit
occupier for vehicle parking only.
b. 6 visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use.
c. 1 disabled parking space/s within the total which is clearly marked for that purpose.
d. Dimensions, crossfalls and gradients in accordance with Australian Standard
AS/NZS2890.1:2004 Parking Facilities.
22. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
23. Directional signage must be provided to direct visitors to the car parking spaces provided
on site.
24. All vehicles must enter and exit the site in a forward gear.
Pedestrian and Bicycle Facilities
25. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. a 2 metre wide footpath within the road verge for the entire length of the site’s
frontage to Church Street
Condition 25 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
26. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and be generally in accordance with drawing number 184-001-300
Revision D dated 4 June 2023 prepared by Bax Engineering.
Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Services
27. Underground reticulated electricity and telecommunication services must be provided to
each unit in accordance with the standards and requirements of the relevant service
provider.
6463731_1
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.