Judgement - 11C Church Street
28. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
29. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater) which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
30. Easements for stormwater drainage purposes must be registered in favour of Council
against the title of the subject development site. The easements must be generally in
accordance with the approved plans. The easement terms must be generally in
accordance with Council’s standard dealing number 715597508 but amended to place
the ongoing maintenance responsibilities on the property owner (the grantor). The
easements must be registered prior to the commencement of the use for the first stage.
31. To facilitate maintenance of the retaining wall and drainage infrastructure, an easement
for access purposes must be registered in favour of the owner of the development site
along the northern extent of the area to be transferred to Council for environmental
purposes. The easement must be a minimum of 3m wide and extend from Church Street
to the western boundary of the site. The easement must be registered prior to the
commencement of the use of for the first stage.
32. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
33. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement
prior to the commencement of the use.
34. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
35. All earthworks and associated banks/batters must be undertaken in accordance with an
Operational Works approval and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
36. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All retaining
walls that are publicly accessible and exceed 1.0m in height must be fitted with a
commercial grade safety fence.
Damage to Services and Assets
37. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
HYDROLOGY
6463731_1
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.