Judgement - 11C Church Street
Stormwater Drainage
38. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, the Queensland Urban Drainage Manual and AS3500 and must include
in particular:
a. the works as generally described in the Hydraulic Impact Assessment Rev E
prepared by BAX Engineering dated 14/07/2023.
b. extension of the site stormwater system to accommodate stormwater from
catchments external to the site, including registration of drainage easements over
the flowpaths within the site which convey external catchment. Easement locations
and dimensions are to be shown on the operational works drawings.
c. design of the batter chute and rock stabilisation within the natural drainage channel
is to be undertaken in accordance with the Brisbane City Council Guideline
Erosion Treatment for Urban Creek Guidelines Version 3 (2004)
Stormwater Quality Management
39. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the
Bioretention Technical Design Guidelines (Water by Design, 2014), and must include in
particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in the Hydraulic Impact Assessment Rev E prepared
by BAX Engineering dated 14/07/2023
b. bioretention devices which:
I. are designed generally in accordance with IPWEA Standard Drawing No.s
DS-073, DS-075 and DS-076
II. are provided with a free-draining outlet from the sub-soil drainage system.
40. Permanent educational signage must be erected to educate the residents of the
development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval.
41. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system and
detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
42. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
and must include the full cost of maintaining the system in accordance with Water by
Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of
maintaining the system must be included in the proposed levies for each unit owner.
6463731_1
6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.