GENERAL COMMITTEE MEETING MINUTES 15 AUGUST 2022
Pedestrian and Bicycle Facilities
54. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. a 2 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Hoffman Drive and the internal service road;
b. signage and lighting at strategic locations to direct people to building entries and
public toilet facilities;
c. a total of 16 bicycle parking spaces; and
d. end of trip facilities involving 8 lockers, 2 male and female showers and change
rooms within the development.
Water Quality
55. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and the
latest version of the Water Sensitive Urban Design Technical Design Guidelines for
South East Queensland, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in Stormwater Management Plan, prepared by
MPN Consulting, dated 27th June 2022;
b. bioretention devices which:
i. demonstrate that Bio basin 1 is able to gravity drain to the existing
stormwater infrastructure on site. The outlet pipe grade must be a
minimum of 0.5% to ensure the bio basin is free draining.
ii. are designed generally in accordance with the Bioretention Technical
Design Guidelines (Water by Design, 2012)
iii. are designed, where applicable, generally in accordance with IPWEQA
Standard Drawing No. DS-073, DS-075, DS-076, and DS-078
iv. are provided with a free-draining outlet from the sub-soil drainage system
56. A maintenance manual is required to be prepared for the stormwater quality treatment
devices, rainwater tanks and basement pump out system for the development. This
manual is to be submitted to Council at Operational Works stage for review.
57. Permanent educational signage must be erected to educate the residents of the
development about the function of the bioretention device(s). The dimensions,
standard, presentation and location of the educational signage must be in accordance
with an Operational Works approval.
58. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system and
detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
59. Any proposed Community Management Statement required for the development must
include Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1)
and must include the full cost of maintaining the system in accordance with Water by
Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The cost of
maintaining the system must be included in the proposed levies for each unit owner.
Page 10 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.