GENERAL COMMITTEE MEETING MINUTES 15 AUGUST 2022
Stormwater Drainage
60. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and the Queensland Urban Drainage Manual, and must include in
particular:
a. the detention system generally as described in Stormwater Management Plan,
prepared by MPN Consulting, dated 27th June 2022;
b. the use of gravity stormwater drainage and not surcharge pits to the maximum
extent practicable. Surcharge pits may only be used where the catchment is
composed of roof surfaces only;
c. provision of rainwater tanks for the capture and reuse of roof water for the
irrigation of communal landscaping; and
d. accommodation for both severe storms or severe blockage of the underground
drainage network. A Severe Storm/Severe Blockage Assessment for the
drainage system proposed for the site is to be provided with the development
application for operational works, and is to demonstrate that finished floor levels
will not be inundated under either a severe blockage of the underground drainage
network in the 1%AEP event at year 2100, or for a severe storm exceeding the
1%AEP based on design blockage.
Acid Sulfate Soils
61. An Acid Sulfate Soil Management Plan must be prepared and submitted with the
Operational Works application for the site. The acid sulfate management plan must
include testing, monitoring and treatment requirements for the works.
Services
62. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
63. Certification must be submitted to Council from all relevant service providers (Energex,
NBN and Unitywater which certifies that the development has met the requirements of
this Decision Notice and all applicable legislation at the time of construction.
Easements
64. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
65. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
66. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
67. All excavation, fill, soil retaining structures and associated batters must be undertaken
in accordance with an Operational Works approval, and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
Page 11 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.