Original source · versioned page text
2022-08-15 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 15 AUGUST 2022
Retention of Existing Vegetation
31. A Tree Management Plan in accordance with AS4970-2009 detailing vegetation in the
covenant to the north of the site (Cov. I SP182845). The TMP will demonstrate the
Tree Protection Zones and Structural Root Zones of vegetation in the covenant are
protected, to ensure the health and longevity of vegetation in the covenant. If impacts
are proposed, offset planting may be required for any impacted vegetation.
32. The report must be resubmitted to Council incorporating the above amendments prior
to the issue of any Development Permit for Operational Works.
33. Prior to the prestart meeting, a bank guarantee or a bond of $30,000 must be lodged
as security for the protection of the tree/s identified for retention in the conditions of this
approval. The bond:
a. may be drawn upon by Council in its entirety if any one tree identified for retention
is damaged to the point where the tree cannot be saved (as confirmed by the
project arborist and agreed in writing by Council)
b. will be returned upon practical completion of all the operational works relating to
this development.
34. The tree/s identified for retention in the conditions of this approval must be maintained
in good health for the life of the tree.
Environment
35. Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994)
must not be released from the site or to waters within the site, or be likely to be released
should rainfall occur, unless all reasonable and practicable measures are taken to
prevent or minimise the release and concentration of contamination.
36. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed, installed
and maintained in accordance with current best practice standards
(*Refer to Advisory Notes).
37. Limit soil exposure on the site to a distance of no more than 2m beyond the extent of
earthworks shown on the approved plans except where the exposed soil is effectively
stabilised without delay and prior to rainfall occurring.
ENGINEERING/TRAFFIC
External Works
38. Hoffman Drive and the internal service road must be upgraded for the length of its
frontage to the subject site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. Rectification of any damage to existing kerb and channelling; and
b. Construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice.
Site Access and Driveways
39. A sealed access driveway must be provided from the internal service road to all parking
and manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawing RS-051 and
respective addendum; and
Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.