39, All carparking shall be kept, maintained and line-marked in a condition fit for use.
40, All staff carpark spaces shall be clearly defined by line marking each space with the
words "Staff Parking Only" and by sign posting each space with a similar wording.
Pathway Lighting
41 . The existing pathway between the two existing lots shall have lighting installed from
Goodchap Street to the rear boundary of Lot 4, This lighting shall have a high energy
efficient rating to the reasonable satisfaction of Council and be designed to meet
appropriate safety standards and riot to adversely impact residences in the area.
Vegetation Protection & Preservation
42. Vehicular pavements within the drip zone of any of the existing trees on site to be
retained shall be designed as a pervious pavement (such as grass paving cells or
similar), as this will allow water that falls on this surface to penetrate to the trees root
system. The pavement shall be constructed so as not to damage the tree or their root
system and in this regard temporary fencing shall be provided around the trees during
construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type
and extent of the pervious pavement and the temporary fencing prior to
obtaining a Development Permit for Operational Works,
Frontage Works
43. Tree planting is required to the Goodchap Street frontage of Proposed Lot 5 in
accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guideffnes.
Roof Water & Stormwater Drainage
44, Roof runoff from any new building shall be directed to a rainwater storage system or
tank (minimum storage the greater of 5000 litres or 15 litres/in' of roof area) that is
installed to ensure water from the tank is used for external uses (such as watering
gardens, irrigation, ornamental ponds* water features, outdoor cleaning, etc) and for
use in flushing of toilets internal to the building. All rainwater tanks are to be designed
and installed in accordance with the Queensland Development Code (QDC), Part 25 -
Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the
plans submitted for Building Works I Operational Works approval and any overtlow
shall be directed to an approved discharge point.
45. All stormwater drainage (including roof water overflow from the rainwater storage
system) shall be collected and discharged so there is no net increase in stormwater
runofl from the site
46. A Stormwater Management Plan shall be submitted 10 Council in conjunction with an
operational works application to demonstrate how water quality and quantity objectives
are to be met. This Management Plan shall set the objectives and include a plan
indicating location and sizing of the devices prosed, The operational works application
shall be in accordance with this plan and buildings shall be modified if required to
accommodate the necessary treatment infrastructure.
All other clean stormwater, such as roof water, can be collected on site and
discharged through a single underground drain line directly into the existing
drainage system, bypassing the grease/oil arrestor and treatment system.
Leg. "4754/127_I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Infrastructure Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.