52. Earthworks carried out on site shall not affect the structural integrity of any of the
existing fences or structures that border the development site. Fences that are
affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification. In this regard any fences to be replaced shall be clearly shown on the
plans submitted for Operational Works approval,
Acid Sulfate Soils
53. As the site is located below the 5m AHD, any excavation works consisting of loom' or
greater and/or any filling works consisting of 500m' or greater and with an average
depth of 0.5m or greater will need to be carried out in accordance with State Planning
Policy 2102 Planning and Managing Development Involvihg Acid SUI^te Sorts. In this
regard appropriate testing and supporting documentation prepared by a suitably
qualified specialist shall be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works,
Erosion and Sediment Control
54. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access to
the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment
are required to be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
55. Monetary contributions shall be paid to Noosa Council towards the cost of providing
andor upgrading various infrastructure at the rates applicable at the time of payment.
An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
STAGE B TOTAL
Contribution Required For: STAGE A (in addition Stage A +
to Stage A) Stage B
PSP12 - Public O an S ace Contributions Park 3233 o 3233
PSP16 - Sewera e Headworks Contributions 346.7 $ I 4785 $ 49402
PSP17 - Water SU I Headworks Contributions $29629 $25727 $ 55 356
PSP20 - Pathwa Trunk Network Contributions $ 3266 $0 $ 3,266
TOTAL Contribution Amount = $ 70,745 $ 40,512 ,,,, 257
Please note, that these amounts are all sub ect to variations In the Consumer Price Index, All
Grou Brisbane from SEPTEMBER 2008 until the date of a ent.
All contributions must be paid prior to the issue of a Development Permit for
Operational Works for the relevant stage.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.
Should not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
Processing of bonds for security where specific Council approval has been
given for the bonding of contributions will incur an administration fee in
accordance with Council's Land Development Commercial & Regulatory Fees
at the time of lodgement.
Legal1,7541127_I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Infrastructure Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.