Council archive · source document
Attachment 3 - Infrastructure Agreement · 132007.12.8
Attached to the e-mail 132007.12.8 - Response to Information Request.
In the event that the Development Permit for Material Change of Use of
Premises lapses or is cancelled, the paid contributions and/or the trading bank
guarantee will be returned.
General
56* A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conlunction with an application for a
Development Permit for Operational Works. To avoid conflict with underground pipes
or services, all existing and proposed services required by the development shall be
shown on the plans.
57. Any alteration of any public utility or other facilities neoessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.
58. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
Environmental Health
59. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 'Waste Management Multi-Dwellings and Commercial
and Industrial Premises", including an external imperviously paved area correctly sized
for all refuse and recycling containers and suitably screened from public places and
neighbouring properties.
60. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
61. All refrigeration plant including motors, shall be situated within the building or suitably
provided with noise reduction measures and located as to prevent a noise nuisance
beyond the subject land in accordance with the nuisance provisions of the
Environmental Protection Regulation I 998. On the spot fines apply for such offences.
62. Noise emission from air conditioning equipment shall comply with the following
requirements:
62.1. The equipment shall be installed and located in a manner which prevents noise
nuisance beyond the subject land in accordance with the nuisance provisions of
the Environmental Protection Regulation 1998 and Council's Local Law No. 12 -
Control of Nuisances. Infringement Notices (on-the-spot fines) may apply for
offences.
62.2, Submission of written certification from a suitably qualified person confirming that
the noise levels comply when measured at the nearest residential boundary.
This is required immediately after installation of the equipment and prior to any
occupation of the building, and in a format approved by Council.
62.3. A person must not use equipment on any day if it makes or causes noise to be
made -
62.3. I. Before 7am or after lopm: More than the lower of either -
Leg1147541127_I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Infrastructure Agreement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.