Council archive · source document
Attachment 3 - Infrastructure Agreement · 132007.12.8
Attached to the e-mail 132007.12.8 - Response to Information Request.
. 40 d(B)A
. S d(B)A above the background noise level
62.3.2. From 7am to 7pm: More than the lower of either -
. 50 d(B)A
. 5 d(B)A above the background noise level
62.3.3. From 7pm to lopm: More than 3 d(B)A above the background noise
level.
Additional Conditions 7/3/08
63. The applicant shall enter into an infrastructure agreement with Council with
regard to the provision of private services within the 5m wide road reserve that
divides the two separate parts of Lot 4 prior to the use commencing on the
northern part of Lot 4. The conditions of the infrastructure agreement shall:
a) Provide for the installation, maintenance and preservation of the private
water an electrical services that supply the separate parts of Lot 4,
by Provide for the maintenance of the road reserve in those parts affected by
the private services,
c) State that the applicant is responsible for obtaining approval for the design
and construction of the various services from the relevant authority,
d) State that the design and construction of the services shall be wholly at the
applicant's expense and shall riot entail a financial encumbrance on future
purchasers of the proposed lot, and
e) Be to the satisfaction of the Department of Natural Resources and Water
(DNR&W). If DNR&W does not consent to the private services crossing
their land the applicant shall find an alternative means of providing
services to the balance of Lot 4 prior to the use commencing.
64. The required contributions shall be paid to Council and the associated car parking
constructed,
Additional Conditions 16/3/1 O
65. Vehicular access arrangements can be varied to allow for an alternative access
arrangement for northern vehicle access to the site from Goodchap Street, The
alternative access arrangement shall be generally in accordance with Drawing No.
PI 00, Job No. 06679 prepared by ToD Noosa dated 29 May 2009. The works shall
include but not be limited to:-
i. The linemarking necessary to provide the right turn lane and associated
medians,
ii. The direction linemarking within the existing access,
.,.
iii. The widening of the current vehicle crossover, and
.
iv. Any works associated with the existing Telstra pit to the satisfaction of
Telstra. Suitable certification from Telstra shall be submitted to Council
Legal1,7541127_I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Infrastructure Agreement.pdfRelated documentApplication case desk ↗