Appendix 3 - Stormwater quality management plan

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Stormwater Quality Management Plan – Commercial Development at Weyba Road, Noosaville         CC-3668



2.3.3.    Effectiveness in Pollution Reduction
The water quality model was set up with the incorporation of the above devices to reduce pollutant
export to WQO levels. Table 2.5 below indicates the predicted pollutant reductions as calculated by
MUSIC.

                            Table 2.5 – Treatment Train Effectiveness

                         Pollutant (kg/yr)                   % Load Reduction

                Total Suspended Solids (TSS)                       89.8%

                Total Phosphorus (TP)                              65.8%

                Total Nitrogen (TN)                                61.3%

                Gross Pollutants >5mm (GP)                          100%



The MUSIC modelling results shown above indicate that the treatment train will adequately treat TSS,
TP and TN in accordance with the targets required under the water quality objectives stated in Section
2.3.1 of this report.

2.3.4.    Hydrocarbons
Hydrocarbons are not a target pollutant in regards to achieving the WQO’s as specified by the SPP.
Given the nature of the development proposal it is however considered prudent to identify how
hydrocarbons will be captured on-site and appropriately disposed of. As there is a very short and
direct passage of drainage from the site to Weyba Creek and the Noosa River it is proposed to drain
the bowser areas under the canopies to trade-waste via a hydrocarbon separator such as a Clereflo
Forecourt full retention separator, or approved equivalent. This device will provide full capture of
wash-down and drainage from the bowser areas, hydrocarbons are retained in the device for
disposal whilst remaining water is discharged to the sewer system via a trade-waste permit.

2.3.5.    Maintenance
An Operational Management and Maintenance Manual has been produced for the water tank and bio-
retention devices and is attached to this document as Appendix C. The manual outlines maintenance
responsibilities and requirements for the future operators of the water quality treatment devices. The
maintenance of the proprietary hydrocarbon separator should be in strict accordance with the
manufactures specifications.




                                                                                                     8
Log in to download the original file

Appendix 3 - Stormwater quality management plan.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.