PL190198 Plumbing Permit

Attached to the e-mail Change to DA (GIA) - MCU16/0140.02.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

aR
jefe] NOOSA COUNCIL

Department: Building & Plumbing Services
Direct Telephone: 5329 6480
Email: [email protected]

Application Number: PL19/0198

28 June 2019

Water Wise Design

PO Box 5485
TORQUAY QLD 4655
Dear Sir/Madam,
Plumbing Compliance Permit
Plumbing and Drainage Act 2002
i PROPERTY DETAILS
Application No: PL19/0198
Street address: 42 Hofmann Dr NOOSAVILLE QLD 4566

Real property description: Lot 5 SP 264847

2 APPLICATION DETAILS

Stage 2 - Storage Sheds - 4 Fixtures and Fire Service

Your application for the compliance assessment of plans for regulated work (that is
plumbing and drainage work) under S85 of the Plumbing and Drainage Act 2002 was
decided on 28 June 2019 by Council's — Plumbing Services.

3. ASSESSED DOCUMENTS/PLANS

The following plans and documents were assessed for compliance with the Standard
Plumbing and Drainage Regulation 2003:

e Form 1 (compliance assessment application for plumbing, drainage and on-
site sewerage work)

e Hydraulic Designs by Water Wise Design Hydraulic Services. Job Number:
190523. Disc H. Drawing Number: 001, 002, 003. Issue: A.

4. CONDITIONS OF APPROVAL

The plumbing approval is subject to the following conditions:

NOTE: PROVIDE A COPY OF THIS PERMIT TO THE RESPONSIBLE LICENSED
PLUMBING AND DRAINAGE CONTRACTOR.

Development Conditions

Compliance must be achieved with all other Development Conditions applicable to the
premise relating to plumbing and drainage. i.e. conditions relating to a Material Change of
Use or Reconfiguration of a Lot.

(Reason: Conditions nominated on a Compliance Certificate for Plumbing and Drainage are

 

NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected]
ABN: 97 969 214 121 TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qid gayet! of 4
Log in to download the original file

PL190198 Plumbing Permit.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

subservient to all other related Development Conditions.)
Stages for assessment of compliance assessable work

Section 86(5) of the Plumbing and Drainage Act 2002 requires that the local government
must assess compliance assessable work at stages prescribed under the Standard
Plumbing and Drainage Regulation 2003.

(1) Section 19 of the Standard Plumbing and Drainage Regulation requires each of the
following stages of compliance assessable work be assessed -

(a) For plumbing or drainage laid under a floor slab or in another area where pipes
or fittings will be covered-before the floor slab is laid or the pipes or fittings are
covered;

(b) For plumbing or drainage that is laid below ground level and external to a
building or other structure-before the backfill is placed;

(c) For plumbing installed in a building or other structure-before the cladding or
lining covering the plumbing is fixed;

(d) When the plumbing or drainage work, the subject of the request for compliance
assessment, is completed;

(2) The responsible person for the work must-

(a) Request an assessment of the work at each of the applicable stages mentioned
in subsection (1); and

(b) For the stage mentioned subsection (1) (d)-make the request within 7 days
after the work is completed; and

(c) Before or when the work is assessed, give the local government details in the
approved form of the responsible person.

(3) The responsible person may request an assessment of the work only if the
information or documents have been provided to the local government.

(4) For the purposes of this section, compliance assessable work is completed when
the work becomes operational.

Approved Plans to be On-site

The Responsible Person is to ensure that an up to date copy of Noosa Council approved
plans are on-site when requesting an inspection of Plumbing and Drainage works.

Approved plans must be available for the Plumbing Inspector for the perusal of Compliance
assessable works for the site.

As-Constructed drawings to be lodged with Council

The Applicant/Responsible person must supply a complete set of as-constructed drawings
to Plumbing Services for Drainage works carried out on the site.

As-Constructed drawings must be lodged with Noosa Council Plumbing Services prior to
booking a Final Plumbing Inspection.

Drawings must contain comprehensive detail of the works undertaken and be of a
professional standard, (these may be hard copy format or electronic format).

5. RELEVANT PERIOD OF APPROVAL

This Plumbing Compliance Permit has effect for a period of two (2) years from the decision
date 28 June 2019 and will therefore lapse 27 June 2021.

Page 2 of 4

Page 3

Should the work commence, the responsible person must ensure that all mandatory
inspections are undertaken by Council before 27 June 2021. This permit continues to have
effect and attaches to the land and binds the owner; the owner’s successors in title and the
occupier of the land.

6. RESPONSIBLE PERSON

The responsible person for regulated work is a person licensed for the work and who
performs, directs the performance of, or supervises the work.

The responsible person must ensure the work performed complies with the Standard
Plumbing and Drainage Regulation 2003.

The responsible person must submit their details to Council on the approved Form 7
(Notification of Responsible Person) unless nominated at application stage.

Inspections must be booked by a licensed person (Plumber/Drainer), please quote
application number PL19/0198 when booking inspections.

Inspections may be booked by calling: (07) 5329 6480.

cf APPEALS AGAINST THIS DECISION

If you are dissatisfied with the decision of Council to impose the conditions mentioned
above on this Compliance Permit, you are entitled to appeal to a Building and Development
Tribunal. It is important to note that legal representation is not permitted at such a tribunal.

If you choose to do this, an appeal against this Notice must be lodged within twenty (20)
business days of the day you receive this Notice. Should your appeal not be lodged within
this time frame, no further action can be taken by a tribunal in relation to Council’s decision.

You can initiate an appeal by lodging an Appeal Notice (Form 10) and the prescribed fee
with the registrar of Building and Development Tribunals as follows:

Post to:

The Registrar

Department of Housing and Public Works
GPO Box 2457

BRISBANE QLD 4001

For further information about the Building and Development Tribunals, including the Appeal
Notice (Form 10) and the schedule of fees, visit the Department's website at
www.hpw.qld.gov.au or contact the Registrar on 1800 804 833 or fax (07) 3237 1248.

For enquiries in relation to this Compliance Permit please contact Building and Plumbing
Services on 5329 6480.

Page 3 of 4

Page 4

Yours faithfully

ee

PO),

Evan Woolway
PLUMBING INSPECTOR

cc

Moneta Cassa 2 Pty Ltd TTE
PO Box 674
NOOSA HEADS QLD 4567

Page 4 of 4

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.