PL190198 Plumbing Permit
Attached to the e-mail Change to DA (GIA) - MCU16/0140.02.
aR jefe] NOOSA COUNCIL Department: Building & Plumbing Services Direct Telephone: 5329 6480 Email: [email protected] Application Number: PL19/0198 28 June 2019 Water Wise Design PO Box 5485 TORQUAY QLD 4655 Dear Sir/Madam, Plumbing Compliance Permit Plumbing and Drainage Act 2002 i PROPERTY DETAILS Application No: PL19/0198 Street address: 42 Hofmann Dr NOOSAVILLE QLD 4566 Real property description: Lot 5 SP 264847 2 APPLICATION DETAILS Stage 2 - Storage Sheds - 4 Fixtures and Fire Service Your application for the compliance assessment of plans for regulated work (that is plumbing and drainage work) under S85 of the Plumbing and Drainage Act 2002 was decided on 28 June 2019 by Council's — Plumbing Services. 3. ASSESSED DOCUMENTS/PLANS The following plans and documents were assessed for compliance with the Standard Plumbing and Drainage Regulation 2003: e Form 1 (compliance assessment application for plumbing, drainage and on- site sewerage work) e Hydraulic Designs by Water Wise Design Hydraulic Services. Job Number: 190523. Disc H. Drawing Number: 001, 002, 003. Issue: A. 4. CONDITIONS OF APPROVAL The plumbing approval is subject to the following conditions: NOTE: PROVIDE A COPY OF THIS PERMIT TO THE RESPONSIBLE LICENSED PLUMBING AND DRAINAGE CONTRACTOR. Development Conditions Compliance must be achieved with all other Development Conditions applicable to the premise relating to plumbing and drainage. i.e. conditions relating to a Material Change of Use or Reconfiguration of a Lot. (Reason: Conditions nominated on a Compliance Certificate for Plumbing and Drainage are NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected] ABN: 97 969 214 121 TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qid gayet! of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 3 pages
Page 2
subservient to all other related Development Conditions.) Stages for assessment of compliance assessable work Section 86(5) of the Plumbing and Drainage Act 2002 requires that the local government must assess compliance assessable work at stages prescribed under the Standard Plumbing and Drainage Regulation 2003. (1) Section 19 of the Standard Plumbing and Drainage Regulation requires each of the following stages of compliance assessable work be assessed - (a) For plumbing or drainage laid under a floor slab or in another area where pipes or fittings will be covered-before the floor slab is laid or the pipes or fittings are covered; (b) For plumbing or drainage that is laid below ground level and external to a building or other structure-before the backfill is placed; (c) For plumbing installed in a building or other structure-before the cladding or lining covering the plumbing is fixed; (d) When the plumbing or drainage work, the subject of the request for compliance assessment, is completed; (2) The responsible person for the work must- (a) Request an assessment of the work at each of the applicable stages mentioned in subsection (1); and (b) For the stage mentioned subsection (1) (d)-make the request within 7 days after the work is completed; and (c) Before or when the work is assessed, give the local government details in the approved form of the responsible person. (3) The responsible person may request an assessment of the work only if the information or documents have been provided to the local government. (4) For the purposes of this section, compliance assessable work is completed when the work becomes operational. Approved Plans to be On-site The Responsible Person is to ensure that an up to date copy of Noosa Council approved plans are on-site when requesting an inspection of Plumbing and Drainage works. Approved plans must be available for the Plumbing Inspector for the perusal of Compliance assessable works for the site. As-Constructed drawings to be lodged with Council The Applicant/Responsible person must supply a complete set of as-constructed drawings to Plumbing Services for Drainage works carried out on the site. As-Constructed drawings must be lodged with Noosa Council Plumbing Services prior to booking a Final Plumbing Inspection. Drawings must contain comprehensive detail of the works undertaken and be of a professional standard, (these may be hard copy format or electronic format). 5. RELEVANT PERIOD OF APPROVAL This Plumbing Compliance Permit has effect for a period of two (2) years from the decision date 28 June 2019 and will therefore lapse 27 June 2021. Page 2 of 4
Page 3
Should the work commence, the responsible person must ensure that all mandatory inspections are undertaken by Council before 27 June 2021. This permit continues to have effect and attaches to the land and binds the owner; the owner’s successors in title and the occupier of the land. 6. RESPONSIBLE PERSON The responsible person for regulated work is a person licensed for the work and who performs, directs the performance of, or supervises the work. The responsible person must ensure the work performed complies with the Standard Plumbing and Drainage Regulation 2003. The responsible person must submit their details to Council on the approved Form 7 (Notification of Responsible Person) unless nominated at application stage. Inspections must be booked by a licensed person (Plumber/Drainer), please quote application number PL19/0198 when booking inspections. Inspections may be booked by calling: (07) 5329 6480. cf APPEALS AGAINST THIS DECISION If you are dissatisfied with the decision of Council to impose the conditions mentioned above on this Compliance Permit, you are entitled to appeal to a Building and Development Tribunal. It is important to note that legal representation is not permitted at such a tribunal. If you choose to do this, an appeal against this Notice must be lodged within twenty (20) business days of the day you receive this Notice. Should your appeal not be lodged within this time frame, no further action can be taken by a tribunal in relation to Council’s decision. You can initiate an appeal by lodging an Appeal Notice (Form 10) and the prescribed fee with the registrar of Building and Development Tribunals as follows: Post to: The Registrar Department of Housing and Public Works GPO Box 2457 BRISBANE QLD 4001 For further information about the Building and Development Tribunals, including the Appeal Notice (Form 10) and the schedule of fees, visit the Department's website at www.hpw.qld.gov.au or contact the Registrar on 1800 804 833 or fax (07) 3237 1248. For enquiries in relation to this Compliance Permit please contact Building and Plumbing Services on 5329 6480. Page 3 of 4
Page 4
Yours faithfully ee PO), Evan Woolway PLUMBING INSPECTOR cc Moneta Cassa 2 Pty Ltd TTE PO Box 674 NOOSA HEADS QLD 4567 Page 4 of 4