PL190198 Plumbing Permit

Attached to the e-mail Change to DA (GIA) - MCU16/0140.02.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

subservient to all other related Development Conditions.)
Stages for assessment of compliance assessable work

Section 86(5) of the Plumbing and Drainage Act 2002 requires that the local government
must assess compliance assessable work at stages prescribed under the Standard
Plumbing and Drainage Regulation 2003.

(1) Section 19 of the Standard Plumbing and Drainage Regulation requires each of the
following stages of compliance assessable work be assessed -

(a) For plumbing or drainage laid under a floor slab or in another area where pipes
or fittings will be covered-before the floor slab is laid or the pipes or fittings are
covered;

(b) For plumbing or drainage that is laid below ground level and external to a
building or other structure-before the backfill is placed;

(c) For plumbing installed in a building or other structure-before the cladding or
lining covering the plumbing is fixed;

(d) When the plumbing or drainage work, the subject of the request for compliance
assessment, is completed;

(2) The responsible person for the work must-

(a) Request an assessment of the work at each of the applicable stages mentioned
in subsection (1); and

(b) For the stage mentioned subsection (1) (d)-make the request within 7 days
after the work is completed; and

(c) Before or when the work is assessed, give the local government details in the
approved form of the responsible person.

(3) The responsible person may request an assessment of the work only if the
information or documents have been provided to the local government.

(4) For the purposes of this section, compliance assessable work is completed when
the work becomes operational.

Approved Plans to be On-site

The Responsible Person is to ensure that an up to date copy of Noosa Council approved
plans are on-site when requesting an inspection of Plumbing and Drainage works.

Approved plans must be available for the Plumbing Inspector for the perusal of Compliance
assessable works for the site.

As-Constructed drawings to be lodged with Council

The Applicant/Responsible person must supply a complete set of as-constructed drawings
to Plumbing Services for Drainage works carried out on the site.

As-Constructed drawings must be lodged with Noosa Council Plumbing Services prior to
booking a Final Plumbing Inspection.

Drawings must contain comprehensive detail of the works undertaken and be of a
professional standard, (these may be hard copy format or electronic format).

5. RELEVANT PERIOD OF APPROVAL

This Plumbing Compliance Permit has effect for a period of two (2) years from the decision
date 28 June 2019 and will therefore lapse 27 June 2021.

Page 2 of 4
Log in to download the original file

PL190198 Plumbing Permit.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.