Original source · versioned page text
2019-07-09 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
Acid Sulfate Soils
53. As the site is located below the 5m AHO, any excavation works consisting of
100m3 or greater and/or any filling works consisting of 500m3 or greater and with
an average depth of 0.5m or greater will need to be carried out in accordance with
State Planning Policy 2/02 Planning and Managing Development Involving Acid
Sulfate Soils. In this regard appropriate testing and supporting documentation
prepared by a suitably qualified specialist shall be submitted to Council for approval
prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
54. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access
to the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
55. Monetary contributions shall be paid to Noosa Council towards the cost of providing
and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council
policies and requirements is outlined in the table below:
STAGE B TOTAL
Contribution Required For: STAGE A (in addition to Stage A+
Stage A) Stage B
PSP12 - Public Open Space $3,233 $0 $ 3,233
Contributions (Park)
PSP16 - Seweraqe Headworks $ 34,617 $ 14,785 $49,402
Contributions
PSP17 -Water Supply $29,629 $25,727 $55,356
Headworks Contributions
PSP20 - Pathway Trunk $ 3,266 $0 $3,266
Network Contributions
TOTAL Contribution Amount = $ 70,745 $40,512 $111,257
Please note that these amounts are all subject to variations in the Consumer Price
Index, All Groups Brisbane from SEPTEMBER 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for
Operational Works for the relevant stage.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%.
Should not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
Processing of bonds for security where specific Council approval has been given
for the bonding of contributions will incur an administration fee in accordance with
Council's Land Development Commercial & Regulatory Fees at the time of
lodgement.
In the event that the Development Permit for Material Change of Use of Premises
lapses or is cancelled, the paid contributions and/or the trading bank guarantee
will be returned.
Page 19 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.