Original source · versioned page text
2019-07-09 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
General
56. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. To avoid conflict with underground
pipes or services, all existing and proposed services required by the development
shall be shown on the plans.
57. Any alteration of any public utility or other facilities necessitated by the
development of the land or associated construction works external to the site shall
be at no cost to Council.
58. The transportation of all materials to and from the site shall be undertaken in a
manner such that no particle matter escapes onto a public road. All vehicles
carrying materials either to or from the site shall be covered to prevent materials
including dust being windblown from the vehicle.
Environmental Health
59. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and
Commercial and Industrial Premises", including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties .
60. Refuse containers .must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulations 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
61. All refrigeration plant including motors, shall be situated within the building or
suitably provided with noise reduction measures and located as to prevent a noise
nuisance beyond the subject land in accordance with the nuisance provisions of
the Environmental Protection Regulation 1998. On the spot fines apply for such
offences.
62. Noise emission from air conditioning equipment shall comply with the following
requirements:
62.1 The equipment shall be installed and located in a manner which prevents
noise nuisance beyond the subject land in accordance with the nuisance
provisions of the Environmental Protection Regulation 1998 and Council's
Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot
fines) may apply for offences.
62.2 Submission of written certification from a suitably qualified person
confirming that the noise levels comply when measured at the nearest
residential boundary. This is required immediately after installation of the
equipment and prior to any occupation of the building, and in a format
approved by Council.
62.3 A perso· n must not use equipment on any day if it makes or causes
noise to be made
62.3.1 Before 7am or after 1Opm: More than the lower of either -
• 40 d(B)A
3 d(B)A above the background noise level
62.3.2 From 7am to 7pm: More than the lower of either -
• 50 d(B)A
5 d(B)A above the background noise level
62.3.3 From 7pm to 10pm: More than 3 d(B)A above the background
noise level.
Page 20 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.