PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
67. Prior to the issue of any Building Approval and commencement of the construction
of Stage D (refer Site Plan DA 01F) in the northwest corner of the site, an
Operational Works approval shall be obtained to address necessary vehicle
access arrangements and additional vehicle movements to, and within the site.
B. Include the following new conditions:
68. Staging of the development is to be in accordance with Site Plan DA 01F (as
annotated by Council).
Access for Stage D
69. Vehicular access arrangements must be varied to allow for an alternative access
arrangement for northern vehicle access to the site from Goodchap Street. The
alternative access arrangement shall be generally in accordance with Drawing
No. 17548-C003 Rev B prepared by TOD Noosa dated 14 September 2018. The
works shall include but not be limited to:-
i. The linemarking necessary to provide the right turn lane and
associated medians,
ii. The direction linemarking within the existing access,
iii. The widening of the current vehicle crossover, and
iv. Any works associated with the existing Telstra pit to the satisfaction of
Telstra. Suitable certification from Telstra shall be submitted to Council prior
to the commencement of any works and at the completion of the works.
Further, a schedule of works, specifications and plans detailing this work shall be
prepared and submitted to Council for approval as part of an application for
Operational Works
Pedestrian Access – Stage D
70. The pedestrian bridge (as annotated on the approved plans) cannot be constructed
until a road closure approval has been obtained from the Department of Natural
Resources and Mines. Council’s consent is to be obtained prior to the application
being lodged with the Department.
Stormwater Management – Stages C & D (Lot 3 RP264909)
71. The stormwater management design must be submitted with an Operational Works
application and must demonstrate that the bioretention basin will only receive
stormwater flows from catchments the bioretention basin is modelled to treat for water
quality improvement purposes (i.e. Sub 2 as detailed on Figure 4 in the Stormwater
Management Plan for Lot 4 Good Chap Street Noosaville by Aquaintel dated 25 June
2017). Any detention area required for catchments that are not modelled to be treated
by the bioretention basin, must be redirected around or under the bioretention basin.
72. Prior to commencement of use of any stage serviced by a stormwater quality treatment
device, such as a bioretention basin, the Community Management Statement must be
updated to identify and schedule the maintenance requirements for the stormwater
quality treatment device asset for that relevant stage.
73. Vegetated stormwater quality treatment infrastructure must be maintained in
accordance with the manufacturer’s specifications or for vegetated stormwater quality
improvement assets, the Water by Design Guideline for Maintaining Vegetated
Stormwater Assets
Construction Management Plan – Stages C & D
74. A Construction Management Plan must be submitted to Council prior to a pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construction phase including:
Page 22 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.