Original source · versioned page text
2019-07-09 Planning & Environment Committee Agenda
The original of this document is very large (13.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 9 JULY 2019
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures prior to construction
ii. Adequate parking arrangements for patrons utilising the site and
construction workers
iii. Proposed fencing to the site during the construction phase of the
development
iv. No queuing of trucks is permitted on Goodchap St or Eumundi Noosa
Road, especially prior to 7.00am. Further parked trucks must have
engines turned off
b. Maintenance and protection of the adjoining Lake Doonella Bush Reserve
c. Maintenance and protection of water quality and existing drainage lines through
the construction site through the implementation of appropriate erosion and
sediment control measures
d. Works programme identifying key components of the works and their respective
durations
e. Establishment of a communication protocol with the general public, adjoining
owners (especially residential), emergency services and local businesses to
advise of agreed construction times, impacts on traffic and services and other
relevant issues
f. Identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
For haulage operations involving significant volumes of fill material or excavated
material being transported onto or off the site: details on the location of external fill
sites/sources, the haulage route, type of vehicle to be utilised during filling operations
and frequency of usage. Any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense.
Landscaping
75. The area between Stage D and the extent of the northern boundary must be densely
landscaped at a minimum width of 2 metres in accordance with an Operational Works
approval. Screening vegetation must be planted in accordance with Council’s
Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. The planted
vegetation must consist of native, endemic species.
Nature and Extent of Approved Use - Veterinary
76. Service vehicle movements associated with the approved use (including loading and
unloading) must not occur outside the hours of 7am to 7pm. The requirements of this
condition must be included in the Community Management Statement for anybody
corporate for the subject site
Sunset Clause
77. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of the approval
for Stage D lapses if the whole of the approved use has not happened 18 July 2025.
C. Advise the applicant that the construction of the bus stop and at grade car park required by
conditions 1, 36, 37, 39, 40 & 66 are outstanding and must be completed by 18 January
2020.
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 23 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.