Attachment C Current Development Approval
Earthworks and Retaining Walls
40. All earthworks and associated batters/retaining structures must be undertaken in accordance
with an Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
41. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Stormwater Drainage
42. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval and the Queensland Urban Drainage Manual, and must include in particular:
a. the detention system generally as described in Site Based Stormwater Management
Plan, prepared by ADG, dated 28th October 2021;
b. provision for the extent of inundation outside of batters of bioretention devices to be
confined to grassed areas only not to impact pathways, structures or the pool and
associated infrastructure for any event up to and including the 1%AEP at year 2100. A
plan showing the extent of inundation and details of proposed signage for grassed
areas subject to inundation are to be provided with the application for operational
works;
c. extension of the site stormwater system to accommodate runoff from any external
catchment areas which drain onto the subject site at the time of the operational works
application being lodged. Any flowpath through the site which conveys external
catchment flows is to be provided with a drainage easement in favour of the external
property, with registration of the easement required prior to commencement of use;
d. the use of gravity stormwater drainage and not surcharge pits to the maximum extent
practicable. Surcharge pits may only be used where the catchment is composed of roof
surfaces only;
e. provision of rainwater tanks for the capture and reuse of roofwater for the irrigation of
communal landscaping; and
f. accommodation for both severe storms or severe blockage of the underground
drainage network. A Severe Storm/Severe Blockage Assessment for the drainage
system proposed for the site is to be provided with the development application for
operational works, and is to demonstrate that finished floor levels will not be inundated
under either a severe blockage of the underground drainage network in the 1%AEP
event at year 2100, or for a severe storm exceeding the 1%AEP based on design
blockage.
Stormwater Quality Management
43. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the latest version
of the Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland, and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Site Based Stormwater Management Plan, prepared by ADG,
dated 28th October 2021;
Page 8 of 24
Document Set ID: 22110072
Version: 4, Version Date: 21/09/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment C Current Development Approval.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.