PM Submission - John Cochrane - MCU21/0110
“Adamson Town Planning, specialising in providing higher order town planning advice”
management and reductions to total volume of runoff from the development site as a whole10.
There is also some onsite detention occurring with the provision for a 135kl rainwater tank used
for topping up the resort pools.
In terms of water quality management, it is proposed to utilise the existing stormwater
management areas (vegetated buffers, vegetated swales, and the lake system on the adjoining
land (Lot 3 on SP178340) constructed as part of the Noosa Springs Golf and Spa Resort. These
devices provide primary water quality treatment of stormwater flows from the existing and
proposed development sites. Harvested rainwater is utilised for irrigation of the golf course and
landscaped areas. The existing constructed waterbodies provide tertiary treatment of stormwater
flows and also provide frequent flow management and reductions to total volume of runoff from
the development site11.
The Engineering Report has addressed the relevant performance outcomes under the Water
Quality and Drainage Code (refer Table 5 in Appendix E). The following comments are made about
the most relevant overall outcomes under the Water Quality and Drainage Code:
a) the waterways, wetlands, drainage lines, receiving environments and other ecologically
important areas will be protected and enhanced by the management of water quality and
quantity of stormwater runoff from the proposed development in accordance with best
practice (OO(a));
b) the stormwater drainage systems have been designed and will be constructed to
effectively manage or convey stormwater in a way that will protect people, property, and
the natural environment (OO(b));
c) stormwater infrastructure and treatment systems are compatible with the existing
infrastructure and has been designed and will be constructed to be cost effective across
the design life. It was originally intended that development within the greater Noosa
Springs development be managed in this manner with the existing infrastructure having
already been provided to cater for the scale of development under the POD (refer
Background, above) (OO(c));
d) it is not expected that climate change will have significant implications for the stormwater
design and management, or the function and capacity of the stormwater infrastructure
and treatment systems in this location which are to be maintained over time (OO(d));
e) the stormwater infrastructure existing and proposed will not affect the flood immunity of
roads based on desired standards of service identified for different flood hazard areas
(OO(e));
f) the existing stormwater treatment systems are visually integrated into the existing golf
course, which incorporates natural, features and habitats (OO(f));
g) the existing stormwater management treatment system is multifunctional providing for
stormwater conveyance, protection of ecologically important areas and erosion and
sediment control (OO(g));
h) the hydrologic regimes are being managed on site to maintain waterway stability, protect
ecology and groundwater dependent ecosystems, and mitigate flood risk to people and
property (OO(h)); and
10 Engineering Report, part 5.2
11 Engineering Report, part 5.3
Noosa Springs Boutique Hotel – GH Australia Pty Ltd Page 55
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (PM Submission - John Cochrane - MCU21_0110.msg)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.