Original source · versioned page text
2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Road furniture maintenance
(Defects monitoring and repairs to guardrails, barriers, guide markers, retaining walls, traffic control devices
& streetscape structures etc.)
Cyclic Inspections No specific inspection schedule at Approach under
present – mainly reactive except for development.
Hastings Street special levy area
requirements.
Scheduled work Hastings St additional works (levy)
Clean and reseal:
• black stone walls & sandstone Annual from 2021
tops Every 3 years from 2021
• stone pitched walls Annual
• seating and bollards. Annual
Reactive work (customer All requests for maintenance. 20 business days (target)
requests)
Signs & lines maintenance
(Provision and maintenance of signs and line-marking within the sealed road network)
Cyclic Inspections Hinterland Work Zones Six monthly
Coastal Work Zones Three monthly
Scheduled work As identified from inspections (defects & proactive interventions) to
maintain clear direction for motorists and pedestrians.
Reactive work (customer All requests for maintenance. 20 business days (target)
requests)
Road verge maintenance
(Verge slashing, vegetation height & width clearing to improve visibility etc.)
Cyclic Inspections No scheduled inspections – work is based on the maintenance
schedule.
Scheduled work Hinterland Work Zones 1-6 Six monthly
Coastal Work Zones 7-9 3 monthly
Claude Batten Drive is
checked weekly by Arborist
& internal chipper crew due
to nature of vegetation in that
location.
Reactive work (customer All requests for maintenance. 20 business days (target)
requests)
Street Cleaning
(Scheduled and reactive mechanical and manual cleaning of sealed street pavements and kerbs in urban
areas to provide good amenity, reduce risk of stormwater drainage blockages, and help protect water quality
in our rivers by reducing the amount of debris and leaves that enter stormwater drainage)
Cyclic Inspections Mechanical street sweeping contract. No scheduled inspections.
Servicing information is
available through GPS in
contractor trucks.
Public spaces cleaning contract -
manual street cleaning/litter pick up Monthly – locations for
inspection selected ad hoc
Scheduled work Mechanical street sweeping Frequency (approx.)
(Contract) iv
• Commercial precincts (Tewantin, Weekly
Noosa Junction, Gympie Tce,
Noosaville, Sunshine Beach,
Peregian Beach – defined streets)
Asset Management Plan: Roads Infrastructure Page 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.