               44.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               45.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice;
               The relevant conditions of the higher order Material Change of Use approval MCU22/0082 to which
               this approval relates;
               All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications
               and guidelines;
               The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical
               Design Guidelines for South East Queensland” for all water quality devices to be constructed on
               site.
                      Pavement Design and Construction
               46.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               47.    Safe vehicle and pedestrian access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               48.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               49.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Site Access and Driveways
               50.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-051 and any associated addendum.
               51.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               52.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.
               The driveway must be constructed so as not to concentrate stormwater runoff onto neighbouring
               properties
               Underground service conduits for water supply, electricity and any other services must be provided
               as part of the access driveway
               Where there is an existing pedestrian path, a matching crossfall must be provided for the driveway
               on the alignment of the path, for the full width of the path




                                                                                                     Page 7 of 14
Document Set ID: 22208842
Version: 4, Version Date: 14/12/2022
Log in to download the original file

SUPERSEDED - Decision Notice MCU22_0082 OPW22_0134 [As Published].pdf · 223 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.