Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Bushfire Hazard Assessment and Management Plan

of 40

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Table M - Compliance assessment against Assessable Development Benchmarks – NP2020 Bushfire Overlay Code (Table 8.2.3.3)
Performance outcomes                                                         Acceptable outcomes                                                         Comments

Safety of people and property

PO1                                                                          AO1.1                                                                       AO1.1-1.2 - Complies

Development maintains the safety of people and property from the             Development which will materially increase the number of people living or   This report has assessed the bushfire hazard risk from hazardous
adverse impacts of bushfire                                                  congregating on premises, including reconfiguring a lot, is not located     vegetation within the subject site and study area, concluding that the
                                                                             within a medium or high bushfire hazard area.                               proposed reconfiguration is partially located within the potential
                                                                                                                                                         impact buffer area and will marginally increase the number of people
                                                                             AO1.2
                                                                                                                                                         living on the premises / newly created land parcel. Minimum setback
                                                                             Development maximises setbacks from hazardous vegetation to achieve an requirements have been identified to ensure any dwelling located
                                                                             acceptable risk.                                                       within proposed Lot 2 achieves a tolerable level of bushfire hazard risk
                                                                                                                                                         (i.e. BAL29 minimum and outside of a medium or high bushfire hazard
                                                                                                                                                         area) that can be achieve through relevant mitigation measures and/or
                                                                                                                                                         dwelling siting outside of the potential impact buffer noting that
                                                                                                                                                         adequate land area is available on proposed Lot 2 conforming with this
                                                                                                                                                         recommendation. Accordingly, AO1.1 and AO1.2 can be achieved.


Impacts on Ecologically Important Areas

PO2                                                                          No acceptable outcome provided                                              PO2 - Complies

Bushfire mitigation measures do not adversely impact on:                                                                                                 No bushfire mitigation measures proposed the interference or impact
                                                                                                                                                         to vegetation, thus preserving the biodiversity values and long term
      a.   biodiversity values, connectivity and ecosystem functioning;
                                                                                                                                                         physical integrity of waterways, wetland connectivity and ecosystem
           and
                                                                                                                                                         functioning and complying with PO2.

      b.   the long term physical integrity of waterways, wetland and
           areas of native vegetation.




Water Supply for Fire Fighting Purposes

PO3                                                                          AO3.1                                                                       AO3.2
                                                                             Premises are connected to the reticulated water supply.


www.thereforgroup.com.au                                                  24-0565E/BF | Sunshine Butterflies | Bushfire Management Plan | 12.03.2026 | Version 1.0
                                                                                                                                       33
Log in to download the original file

Bushfire Hazard Assessment and Management Plan.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.