Geotech Report - Initial Findings
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Essence of Peregian
215-219 David Low Way, Peregian Beach
Project No. 007-160A,
27 April 2010
SECTION 5 - GEOTECHNICAL DESIGN DISCUSSION
5.1 Ground Model
The results of the investigation indicate that the stratigraphy encountered at the bore locations generally
comprised a discontinuous layer of fill and/or possible fill up to approximately 0.8m depth that was underlain
by very loose to loose sands to approximately 1.2m to 3.9m depth with a layer of silty clay encountered in
Bores 1 and 2, then medium dense to dense sands and dense, weakly cemented indurated sands. Strength
inversions were encountered in the sands and indurated sands. For the ground conditions encountered at
the test locations, geotechnical design will need to particularly consider at least (but not exclusively) the
following key issues:
the condition of the existing fill material;
excavatability;
groundwater control during construction;
estimated site settlement;
retaining wall pressures;
suitable foundation types and founding level;
presence of ‘strength inversions’ and their effect on footing design;
the potential for significant settlement and/or liquefaction of the very loose sands;
potential for settlement in surrounding areas; and
construction issues.
Discussion of geotechnical design parameters, as well as design and construction recommendations and
suggestions are detailed in the following sections.
5.2 Existing Fill Condition and Performance
It is not known whether the existing fill material at the site is ‘controlled’ (i.e. it is not known whether the
existing fill has been placed and uniformly compacted to an appropriate engineering specification).
Supporting documentation should be obtained and checked to confirm whether the fill has been placed in a
controlled manner to a specification that is appropriate for the proposed development. If documentation
does not exist, or the specification is not appropriate for the proposed development, then it is suggested that
the existing fill be assumed to be uncontrolled.
If the fill cannot be shown to be controlled, then consideration should be given to the potential for variations
in both the composition and degree of compaction of the fill. The presence of voids within uncontrolled fill as
well as potential soft/loose zones or inclusions of deleterious materials may lead to potentially significant
future total and differential settlements, possibly occurring over relatively short distances.
To minimise the risk of potentially adverse settlement occurring, it is recommended that all uncontrolled fill
present in settlement sensitive areas be removed and replaced/recompacted as controlled fill.
butlerpartners.com.au Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.