Geotech Report - Initial Findings
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Essence of Peregian
215-219 David Low Way, Peregian Beach
Project No. 007-160A,
27 April 2010
5.3 Earthworks
5.3.1 Excavation
Excavation of the sands encountered in the bores should be readily achieved in bulk excavation using a
medium sized hydraulic excavator, possibly supplemented by ripping in any significantly cemented zones.
5.3.2 Temporary Batter Stability
If movement sensitive services are not located ‘close’ to excavations, and geometry permits, battered slopes
may be adopted. Stable (cut) batter angles will need to be properly assessed once design and earthworks
procedures have been finalised. However, as a preliminary guide, the values given in Table 3 are suggested
for unsurcharged batters, up to 3m in height, where some movement behind batter crests is acceptable and
the sands are fully dewatered. Detailed stability analysis prior to bulk earthworks design finalisation will be
required on a location by location basis (as part of bulk earthworks design) to confirm stable batter slopes
and detailed inspection by an experienced geotechnical engineer will be required at the time of construction
to confirm the stability of batter faces.
The batter angles given in Table 3 are based on the assumption that batter faces are protected from erosion
and that drainage is designed to keep surface and groundwater away from the slopes. If free water is
allowed to emanate from batter faces, slopes will be unstable at the nominated batter slopes.
Table 3: Maximum Temporary Unsurcharged Cut Batter Slopes
Material Strength Temporary Cut Batter*
very loose to loose 1V : 3H
Sands
medium dense to dense 1V : 1.5H
* Dewatered
If insufficient space exists for the construction of cut batters at the maximum slopes given in Table 3, positive
excavation support will be required in order to prevent excavation instability.
If buildings etc. are proposed close to slope crests, specific slope stability analysis will be required on a
structure by structure basis to establish stable slope angles and foundation requirements etc. to minimise the
potential for crest movements to adversely affect buildings and to minimise building surcharge loading to
slopes.
Fill batters should be formed by over-filling by a minimum distance of not less than 1m and cutting back to
profile, to ensure proper compaction of batter faces. All exposed fill should be protected from weathering,
erosion and groundwater seepage.
5.3.3 Batter Erosion Protection
It is anticipated that cut and fill batters at the site will erode and require ongoing maintenance. It will be
necessary to install concrete lined collector drains at the crest of slopes and to fully protect batter faces to
minimise future erosion and maintenance requirements.
butlerpartners.com.au Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.