Council archive · source document
Appendix J - Code Assessment · RAL25/0004
Proposed Lot 1, 2 & 3 will gain access via the
establishment of a new 18-23m wide road reserve
inclusive of a mostly 10m wide buffer along the
eastern edge of the road. Each lot will be provided
direct access to this road via new driveway
crossover points (see Appendix C & E for details).
AO13.2 Not applicable.
Development does not require new or
changed access to a state-controlled road that is Site does not adjoin a State-Controlled Road.
a limited access road unless in accordance with
the limited access policy for the state-controlled
road.
AO13.3 Not applicable.
Access easements are in appropriate locations for
safe access and egress, and supply appropriate No access easements proposed (see Appendix C
widths and levels of service for the number of for details).
vehicles that will utilise them as per the
requirements of Council’s Planning Scheme Policy
PSP6 Engineering design standards – Roads,
drainage and earthworks.
Editor's note- Reference should be made to the
Queensland Government's Development
Assessment Mapping System to confirm which are
state-controlled roads or limited access roads.
Movement Network
Traffic No acceptable outcome provided Complies.
PO14
Traffic generated by the development is within the acceptable The proposed development has / will implement all
capacity of external roads and does not have an adverse findings and recommendations of the Traffic Impact
impact upon the functioning of the road network. Assessment to ensure the traffic generated is within
the acceptable capacity of external roads (see
Editor’s Note— Further detail on traffic and the road network Appendix H for details).
is addressed in Part 9.4.8 Transport Code
Roads and Pathways AO15.1 Complies.
PO15 Where involving the construction of a new road,
Development involving the creation of new roads and road planning and design supports the hierarchy The proposed new road will achieve compliance
pathways ensures infrastructure— and functional aspects identified in Council’s with AO15.1 to AO15.4. Details will be provided
Planning Scheme Policy PSP6 on Engineering during the subsequent Operational Works Phase.
(a) provides convenient, safe and efficient movement for all design standards – Roads, drainage and
modes of transport between land use activities; earthworks.
Editor’s Note— Further detail on road and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix J - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 430 KB (small file)
- File type
No other editions are linked here.