Skip to the record
The only place to find full transcripts.

Council archive · source document

Appendix J - Code Assessment · RAL25/0004

of 26

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                                          Reticulate telecommunications; and
                                                                                                                          Reticulated water.
 PO11                                                             No acceptable outcome provided                       Complies.
 Roadway and pathway layout are predominantly rectilinear
 with a high degree of permeability.                                                                                   The proposed new road and pathway have been
                                                                                                                       designed in accordance with PO11 (see
 Editor’s Note— Further detail on traffic and the road                                                                 Appendix E for details).
 network is addressed in Part 9.4.8 Transport Code.
Infrastructure and services
PO12                                                             AO12.1                                                Proposed Lots 1, 2 & 3, and Balance Lot 100 will
New lots are located, sized and configured so as to ensure       All lots are connected to power supply and            connect to the following infrastructure services
each lot is capable of being serviced by appropriate levels of   telecommunications services and where located         (Appendix E, F & G):
infrastructure including:                                        within the Urban boundaries, power supply and            Reticulated electricity;
                                                                 communications infrastructure are provided
(a)   power supply;                                              underground.                                             Reticulated sewerage;
(b)   telecommunications; and                                                                                             Reticulate telecommunications; and
(c)   where within Local Plan Areas                                                                                       Reticulated water.
(d)   reticulated water supply;
                                                                 AO12.2                                                Complies.
(e)   reticulated sewerage; and
                                                                 If located in a water service area each new lot can
(f)   stormwater drainage.
                                                                 be connected to Unitywater’s water supply
 .                                                               network.                                              See AO12.1 comment.

                                                                 AO12.3                                                Complies.
                                                                 If located in a sewerage service area each new lot
                                                                 can be connected to Unitywater’s sewerage
                                                                 network.                                              See AO12.1 comment.

                                                                 AO12.4                                                Complies.
                                                                 If located in a Local plan area lots can be
                                                                 connected to Council’s stormwater drainage
                                                                 network.                                              The proposal will provide additional stormwater
                                                                                                                       drainage infrastructure (see Appendix E for
                                                                                                                       details).

                                                                 AO12.5                                                Not applicable.
                                                                 If not in a sewerage service area each lot has        Site is in a sewerage service area.
                                                                 sufficient area and other attributes to ensure
                                                                 efficient and effective on-site sewerage disposal.
PO13                                                             AO13.1                                                Complies.
Each lot is provided with safe and convenient vehicle access     Vehicular access for the development is consistent    The lots will gain vehicle access from the start of
                                                                 with the function and design of the road it           Dianella Court. On street parallel carparking will be
                                                                 takes access from.                                    provided along the western side of the new road.

Used in these records

About this file

File size
430 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix J - Code Assessment.pdf · 430 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.