Council archive · source document
Appendix J - Code Assessment · RAL25/0004
Reticulate telecommunications; and
Reticulated water.
PO11 No acceptable outcome provided Complies.
Roadway and pathway layout are predominantly rectilinear
with a high degree of permeability. The proposed new road and pathway have been
designed in accordance with PO11 (see
Editor’s Note— Further detail on traffic and the road Appendix E for details).
network is addressed in Part 9.4.8 Transport Code.
Infrastructure and services
PO12 AO12.1 Proposed Lots 1, 2 & 3, and Balance Lot 100 will
New lots are located, sized and configured so as to ensure All lots are connected to power supply and connect to the following infrastructure services
each lot is capable of being serviced by appropriate levels of telecommunications services and where located (Appendix E, F & G):
infrastructure including: within the Urban boundaries, power supply and Reticulated electricity;
communications infrastructure are provided
(a) power supply; underground. Reticulated sewerage;
(b) telecommunications; and Reticulate telecommunications; and
(c) where within Local Plan Areas Reticulated water.
(d) reticulated water supply;
AO12.2 Complies.
(e) reticulated sewerage; and
If located in a water service area each new lot can
(f) stormwater drainage.
be connected to Unitywater’s water supply
. network. See AO12.1 comment.
AO12.3 Complies.
If located in a sewerage service area each new lot
can be connected to Unitywater’s sewerage
network. See AO12.1 comment.
AO12.4 Complies.
If located in a Local plan area lots can be
connected to Council’s stormwater drainage
network. The proposal will provide additional stormwater
drainage infrastructure (see Appendix E for
details).
AO12.5 Not applicable.
If not in a sewerage service area each lot has Site is in a sewerage service area.
sufficient area and other attributes to ensure
efficient and effective on-site sewerage disposal.
PO13 AO13.1 Complies.
Each lot is provided with safe and convenient vehicle access Vehicular access for the development is consistent The lots will gain vehicle access from the start of
with the function and design of the road it Dianella Court. On street parallel carparking will be
takes access from. provided along the western side of the new road.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix J - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 430 KB (small file)
- File type
No other editions are linked here.