PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 7 AUGUST 2018
7. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted for each stage, to secure performance of all conditions of the
relative stage approval. This security must be submitted prior to the issue of a
Development Permit for operational works for the relevant stage. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
8. The requirements of this development approval are to be effected, prior to the use of
the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
Flooding
9. All buildings proposed on site must be constructed to a minimum floor level above the
predicted 1 in 500 ARI design storm (Q500) to avoid the risk of flooding.
Vehicle Access
10. All vehicles must enter and leave the site in a forward direction.
11. Bollards must be installed to the western end of the existing road reserve car park to
contain vehicles within the car park.
Carparking
12. All car parking spaces must be designed and constructed in accordance with AS/NZS
2890.1:2004 (User Class 1 for staff and employees and User Class 3 for visitors) with
allowance for vehicles to enter and leave the site in a forward gear and with a
minimum head clearance (headroom) at any point of 2.2m.
13. All car parking spaces for persons with disabilities must be designed and constructed
in accordance with AS /NZS 2890.6:2009.
14. All carparking must be kept, maintained and line-marked in a condition fit for use.
15. All staff carpark spaces must be clearly defined by line marking each space with the
words “Staff Parking Only” and by sign posting each space with a similar wording.
16. A dedicated pedestrian pathway must be provided linking the proposed carparking
area and the proposed Admin Block. The pathway must:
a. Be a minimum of 1.5m wide,
b. Be located clear of the access driveway, and
c. Include a marked pedestrian crossing point to the Admin Block
Earthworks
17. Earthworks required on site must be carried out in accordance with Council’s
Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause
the additional ponding of water on any adjoining lands or the blockage of, or
interference with, any natural watercourses.
General
18. A suitably qualified Registered Professional Engineer must prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which must be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on
GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
Page 12 of 74
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.