 Performance outcomes                                       Acceptable outcomes                    Response
 services in a state-controlled road.

 Note: Information on the location of services and
 public utility plants in a state-controlled road can be
 obtained from the Dial Before You Dig service.

 Where development will impact on an existing or
 future service or public utility plant in a state-
 controlled road such that the service or public utility
 plant will need to be relocated, the alternative
 alignment must comply with the standards and design
 specifications of the relevant service or public utility
 provider, and any costs of relocation are to be borne
 by the developer.
 PO5 Filling, excavation, building foundations and          No acceptable outcome is prescribed.   Complies with AO – Only minor earthworks
 retaining structures do not undermine, or cause                                                   in road reserve associated with proposed
 subsidence of, a state-controlled road.                                                           awnings.

 Note: To demonstrate compliance with this
 performance outcome, it is recommended an RPEQ
 certified geotechnical assessment, prepared in
 accordance with Volume 3 of the Road Planning And
 Design Manual 2nd edition, Department of Transport
 and Main Roads, 2016, is provided.
 PO6 Filling, excavation, building foundations and          No acceptable outcome is prescribed.   Complies with AO – Only minor earthworks
 retaining structures do not cause ground water                                                    in road reserve associated with proposed
 disturbance in a state-controlled road.                                                           awnings.

 Note: To demonstrate compliance with this
 performance outcome, it is recommended an RPEQ
 certified geotechnical assessment, prepared in
 accordance with Volume 3 of the Road planning and
 design manual 2nd edition, Department of Transport
 and Main Roads, 2016, is provided.
 PO7 Excavation, boring, piling, blasting or fill           No acceptable outcome is prescribed.   Complies with AO – No substantial
 compaction during construction of a                                                               earthworks required.
 development does not result in ground

State Development Assessment Provisions – version 2.0
State code 1: Development in a state-controlled road environment                                                              Page 2 of 19
Log in to download the original file

Att 3 - SDAP compliance.pdf · 174 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.