Original source · versioned page text
Meeting papers
Original PDF page 340, section 1. The text section number identifies this passage in the reader.
Performance Outcomes Acceptable Outcomes
PO78 No acceptable outcome provided.
Development adjoining the central environmental management
and conservation corridor located between the existing
development and the Business Park and Village Mixed Use
precincts provides a high level of amenity and design when
viewed from the adjoining key pedestrian/cycle link and other
public spaces and provides for:
(a) activated frontages and lighting to enhance passive
surveillance;
(b) open space opportunities including parks, informal
recreation or seating opportunities and the like to
create a high amenity and safe connection from the
village green through to Hofmann Drive; and
(c) permeable connections through the development to key
pedestrian and cycle links generally consistent with
Figure 7.2.4.5 (Noosa Business Centre Framework
and Character Plan).
Staging of Development
Page 340 of 1290
Page 31 of 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (62f8d7f274.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.