ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01

Attached to the e-mail 132005.220.04 Request a Change Existing Approval.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                      152005.220.01

         97.7.     Details of measures proposed to be used to ensure no harm occurs to fauna
                   utilising the site.
         Council’s Ecologist shall be consulted during the preparation of the plan.
98.      The site shall be revegetated and rehabilitated in accordance with the Council
         approved Revegetation and Rehabilitation Management Plan. In this regard the
         proposed Park Reserves including riparian areas shall be planted with suitable native
         species and native food trees in general accordance with Council’s Planning Scheme
         Policy PSP3 Landscaping Plants & Guidelines.
99.      An environmental maintenance period of 3 years shall commence after the Park
         Reserves have been re-vegetated and all declared and environmental weeds have
         been removed from the entire property.            Council’s Ecologist shall sign the
         maintenance period ‘on’ and ‘off’ after this work has been successfully completed. To
         this extent Council’s Ecologist has the discretion to pause the maintenance period if
         work has not been carried out in accordance with the Council approved RRMP
         performance criteria and/or if lengthy time delays occur.
100.     All RRMP works shall be undertaken to the reasonable satisfaction of Council’s
         Ecologist prior to Council sealing the plan of survey. An uncompleted works bond
         equivalent to 150% of the works shall be held by Council until all works associated
         with the RRMP have been accepted ‘off maintenance’. Council reserves the right to
         call up this bond for non-compliance with the approved RRMP.
101.     Any cleared vegetation on site shall be suitably processed by one of the following
         methods:
         101.1. Disposal for processing at a sawmill,
         101.2. Processing through a wood-chipper or shredder. The resulting mulch is to be
                stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5m high
                with a minimum of 10m between edges of heaps,
         101.3. Disposal for firewood,
         101.4. Disposal for landscaping purposes.
         101.5. Transport to alternative site for breaking down materials provided that all
                necessary permits have been obtained to allow the alternate site to be used for
                this purpose.
          The disposal method for clearing works is to be submitted in conjunction with an
          application for a Development Permit for Operational W ork. The applicant is advised
          that other methods may be considered provided full details of the method are
          submitted.
          The applicant is also advised that burning off is an unacceptable method of disposal.
102.     To protect the environment against siltation/sediment export or soil erosion as a result
         of this development, an erosion and sediment control plan shall be submitted in
         conjunction with any Development Permit for Operational Works and the approved
         plan strictly adhered to. Site control measures such as silt fencing, controlled gravel
         access to the site and controlled disposal of waste will be necessary.
          To avoid silt and sediment runoff as a result of cleared vegetation, the site shall be
          revegetated as quickly as is reasonably possible and the erosion and sediment
          control plans shall allow for this dense planting.
          The design plans shall also show how stormwater runoff within and from the site is to
          be controlled during construction. Plans shall indicate the measures to be taken to
          prevent erosion, slope instability and the export of sediment from the site and must be
          in accordance with The Manual for Erosion and Sediment Control prepared by the
          Sunshine Coast Regional Council Version 1.2 or later version.



FM1512s/1-07/04/2010                                                             Page 13 of 19
Log in to download the original file

ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01.pdf · 267 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.