Skip to the record
The only place to find full transcripts.

Original source · versioned page text

ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01

Attached to the e-mail 132005.220.04 Request a Change Existing Approval.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                       152005.220.01

112.     Any alteration of any public utility or other facilities necessitated by the development of
         the land or associated construction works external to the site shall be at no cost to
         Council.
113.     The transportation of all materials to and from the site shall be undertaken in a
         manner such that no particle matter escapes onto a public road. All vehicles carrying
         materials either to or from the site shall be covered to prevent materials including dust
         being windblown from the vehicle.
Contributions Towards Council Infrastructure
114.     Monetary contributions shall be paid to Council towards the cost of providing and/or
         upgrading various infrastructure at the rates applicable at the time of payment. An
         estimate only of the contribution amounts under the current Council policies and
         requirements is outlined in the table below:
            Contribution Required For:                                        Amount:
            PSP12 – Public Open Space Contributions (Park)                    $69,534
            PSP16 – Sewerage Headworks Contributions                          $90,467
            PSP17 – Water Supply Headworks Contributions                      $202,068
            PSP20 – Pathway Trunk Network Contributions                       $105,937
            Roadworks Contributions                                           $2,227,670
            TOTAL Contribution Amount =                                       $2,695,676.
            Please note that these amounts are subject to variations in the Consumer Price
            Index, All Groups Brisbane from December 2008 until the date of payment.
All contributions must be paid prior to Council endorsement of the plan of survey.

5   REFERRAL AGENCY CONDITIONS

 Referral Trigger      Referral Status       Referral Agency        Referral Address

 Vegetation            Concurrence           DERM -                 South East Region
                                             Department of          Attention: Jeff Guinea
                                             Natural Resources      PO Box 573
                                             & Water                NAMBOUR QLD 4560

6   APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the
following tables:

Approved Plans
Plan No.                     Rev.    Plan Name                                  Date
38979-E – Sheet 2 of 2               Murray & Associates (Qld) Pty Ltd          5 March 2007




FM1512s/1-07/04/2010                                                               Page 15 of 19
Log in to download the original file

ECM_16693990_v1_APPROVED Change to Existing Approval 152005 220 01.pdf · 267 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.