OP Works - Attachment 5 - 6 Quamby Pl
Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.
in a way to ensure they are structurally sound, having consistent with the following standards— An environmental authority for ERA 16 Extractive
regard to the following— (a) subject to paragraph (c), each Australian Standard relevant to and Screening Activities is currently in place
(a) relevant engineering standards; the design or construction of structures, to the extent requirements and held by the operator who will be engaged
(b) the location of the works; stated in the Standard apply to the design or construction of to undertake the beach replenishments works
(c) the purpose for which the works are to be used; prescribed tidal works; (Attachment 5).
(d) the impact of flooding, storm tide, overtopping by (b) subject to paragraph (c), the projected sea level rise is factored
waves, projected sea level rise, tidal influences and into the design and construction of the prescribed tidal works;
hydrodynamic forces; (c) if a relevant planning scheme standard is more stringent than
(e) the design life of the works; the standard mentioned in paragraph (a) or (b)—the relevant
(f) the dead load of the works and the intended live load planning scheme standard, to the extent it is more stringent than
for the works; the standard mentioned in paragraph (a) or (b).
(g) the impact of hydrostatic pressures on the works;
(h) the stability of individual components of the works,
including, for example, boulders, concrete blocks or
sandbags.
12.2 Prescribed tidal works do not adversely affect the The design and construction of the prescribed tidal works is Complies
structural integrity of any existing revetment or seawall or consistent with the following standards— The proposed works will not adversely impact
another existing structure. (a) subject to paragraph (b), prescribed tidal works, including any upon other existing structures.
abutment, piling or other structure connected with the works— (i)
do not place an additional load on any existing revetment or
seawall or another existing structure; or (ii) can be structurally
supported by an existing revetment or seawall or another existing
structure;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
12.3 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
in a way to ensure they do not adversely affect the consistent with the following standards— The proposed works will not adversely impact
stability of the bed and banks of tidal water. (a) subject to paragraph (b), prescribed tidal works do not cause, upon the existing water movements. The works
by changing the flow of water, the removal of, or disturbance to, are to reestablish the beach back to its
RG Strategic PO Box 1818 07 5430 6659
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.