OP Works - Attachment 5 - 6 Quamby Pl
Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.
The design and construction of the prescribed tidal works is Not Applicable
consistent with the following standards— The proposed operational works will not
(a) subject to paragraph (b), prescribed tidal works do not involve impede public access to State coast land.
the erection or placement of any physical barrier preventing Dredging for the source material will occur
existing public access to, along or across State coastal land near adjacent to the subject site.
8.1 Prescribed tidal works do not have a significant the works;
adverse effect on the availability of public access to, (b) if a relevant planning scheme standard is more stringent than
along or across State coastal land. the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a);
(c) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) and
(b).
9.1 The location and design of prescribed tidal works Public access to State coastal land near the prescribed tidal works Not Applicable
does not adversely affect the safety of members of the is consistent with each relevant planning scheme standard. The proposed operational works will not
public accessing State coastal land adversely affect public safety.
Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to prescribed tidal works
10.1 Prescribed tidal works that are for a private purpose The design and construction of the prescribed tidal works is Not Applicable
do not adversely affect navigable access to, or consistent with the following standards— The proposed operational works will not
navigable egress from, any lot that adjoins, or is in the (a) subject to paragraph (b), prescribed tidal works— (i) for a lot adversely affect access to or egress from the
immediate surroundings of, a lot connected to prescribed connected to the works for which there is a water allocation area — subject site or adjoining properties.
tidal works. are not constructed outside the water allocation area; and (ii) for a
lot connected to works for which there is no water allocation area
—are no closer than 1.5m to that lot’s side boundary or extended
side boundary;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a).
Design, construction and safety—all prescribed tidal works
12.1 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is Complies
RG Strategic PO Box 1818 07 5430 6659
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original