OP Works - Attachment 5 - 6 Quamby Pl

Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                            The design and construction of the prescribed tidal works is            Not Applicable
                                                            consistent with the following standards—                                The proposed operational works will not
                                                            (a) subject to paragraph (b), prescribed tidal works do not involve     impede public access to State coast land.
                                                            the erection or placement of any physical barrier preventing            Dredging for the source material will occur
                                                            existing public access to, along or across State coastal land near      adjacent to the subject site.
8.1 Prescribed tidal works do not have a significant        the works;
adverse effect on the availability of public access to,     (b) if a relevant planning scheme standard is more stringent than
along or across State coastal land.                         the standard mentioned in paragraph (a)—the relevant planning
                                                            scheme standard, to the extent it is more stringent than the
                                                            standard mentioned in paragraph (a);
                                                            (c) any other relevant planning scheme standard that is not
                                                            inconsistent with the standards mentioned in paragraphs (a) and
                                                            (b).
9.1 The location and design of prescribed tidal works       Public access to State coastal land near the prescribed tidal works Not Applicable
does not adversely affect the safety of members of the      is consistent with each relevant planning scheme standard.              The proposed operational works will not
public accessing State coastal land                                                                                                 adversely affect public safety.
Navigable access to, or egress from, lots that adjoin, or are in the immediate surroundings of, a lot connected to prescribed tidal works

10.1 Prescribed tidal works that are for a private purpose The design and construction of the prescribed tidal works is             Not Applicable
do not adversely affect navigable access to, or             consistent with the following standards—                                The proposed operational works will not
navigable egress from, any lot that adjoins, or is in the   (a) subject to paragraph (b), prescribed tidal works— (i) for a lot     adversely affect access to or egress from the
immediate surroundings of, a lot connected to prescribed connected to the works for which there is a water allocation area — subject site or adjoining properties.
tidal works.                                                are not constructed outside the water allocation area; and (ii) for a
                                                            lot connected to works for which there is no water allocation area
                                                            —are no closer than 1.5m to that lot’s side boundary or extended
                                                            side boundary;
                                                            (b) if a relevant planning scheme standard is more stringent than
                                                            the standard mentioned in paragraph (a)—the relevant planning
                                                            scheme standard, to the extent it is more stringent than the
                                                            standard mentioned in paragraph (a).
Design, construction and safety—all prescribed tidal works

12.1 Prescribed tidal works are designed and constructed The design and construction of the prescribed tidal works is               Complies
RG Strategic                                                                                                                      PO Box 1818     07 5430 6659
                                                                                                                                  Noosa Heads     [email protected]
                                                                                                                                  QLD 4567        rgstrategic.com.au
Log in to download the original file

OP Works - Attachment 5 - 6 Quamby Pl.pdf · 381 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.