OP Works - Attachment 5 - 6 Quamby Pl
Attached to the e-mail Proposed Operational Works (Beach Replenishment) OPW19/0238 - 6 Quamby Place Noosa Heads.
to undertake the beach replenishments works
(Attachment 5).
7.2 The location and construction of prescribed tidal Vegetation on land affected by the prescribed tidal works is dealt Not Applicable
works ensures vegetation is cleared or disturbed only to with in a way consistent with the following standards— No vegetation will be disturbed.
the extent reasonably necessary for the works. (a) subject to paragraph (b), the clearing or disturbance of
vegetation for a purpose associated with the construction of
prescribed tidal works, including, for example, parking for
construction or workers’ vehicles or stockpiling of construction
materials— (i) is avoided; or (ii) if the clearing or disturbance of
vegetation for a purpose associated with the construction of the
works can not be avoided—the clearing or disturbance is limited to
the smallest area of land reasonably necessary for the purpose;
(b) any other relevant planning scheme standard that is not
inconsistent with the standard mentioned in paragraph (a).
7.3 After the construction of prescribed tidal works, any Land or vegetation affected by the prescribed tidal works is dealt Not Applicable
land damaged or destabilised by, and any vegetation with in a way consistent with the following standards— No vegetation will be disturbed. The works are
damaged, destroyed or removed by, the construction of (a) subject to paragraph (b)— (i) land surfaces damaged or to permit the replenishment of an existing
the works is rehabilitated. destabilised by the prescribed tidal works are restored and beach.
stabilised; and (ii) vegetation damaged, destroyed or removed by
prescribed tidal works is replaced with native vegetation for the
locality within which the works are located, to the extent it is
reasonably practicable to replace the vegetation with native
vegetation;
(b) if a relevant planning scheme standard is more stringent than
the standard mentioned in paragraph (a)—the relevant planning
scheme standard, to the extent it is more stringent than the
standard mentioned in paragraph (a);
(c) any other relevant planning scheme standard that is not
inconsistent with the standards mentioned in paragraphs (a) and
(b).
Public access—availability and safety
RG Strategic PO Box 1818 07 5430 6659