Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                          column 1                                                 column 2
                 Including amendments to 8 June 2018




                                                                     Specific Outcomes                           Probable solutions (if code assessment)
The Noosa Plan



                                                             in Q100 ARI local rainfall events.               S8.3 Stormwater drainage planning, design and
                                                                                                              construction is in accordance with the
                                                                                                              Queensland Urban Drainage Design Manual.
                                                       O9 Roads and stormwater drainage                       S9.1 Roads and stormwater drainage
                                                       infrastructure is constructed—                         infrastructure is constructed in accordance
                                                       a)    in accordance with appropriate                   with—
                                                             engineering standards; and                       a)    Sections 2, 3 and 4 of PSP5 Engineering
                                                       b)    to minimise adverse environmental                      Design Standards – Roads, Drainage and
                                                             impacts, including from run-off and                    Earthworks;
                                                             erosion.                                         b)    Queensland Design Code for Residential
                                                                                                                    Streets;
                                                                                                              c)    AUSTROADS; or
                                                                                                              d)    A combination of the principles in these
                                                                                                                    documents;
                                                                                                              AND
                                                                                                              S9.2 Erosion and sediment control measures
                                                                                                              are designed and implemented in accordance
                                                                                                              with the Institution of Engineers Australia
                                                                                                              (Queensland Division) Soil Erosion and
                                                                                                              Sediment Control - Guidelines for Queensland
                                                                                                              Construction Sites.
                                                       Environmental Protection
                                                       O10 Roads and stormwater drainage                      S10.1 Roads and stormwater drainage follow
                                                       infrastructure are located and aligned so as to—       the edge of existing disturbed areas, or
                                                       a) minimise disturbance to native vegetation           alternatively, these works are co-located within
                                                            and/or other habitat areas;                       a combined utility corridor;
                                                       b) protect and maintain wildlife corridor              AND
                                                            movements and the safety of native fauna;         S10.2 Roads avoid native vegetation and
                                                       c) minimise changes to the hydrological                provide for fauna underpasses and associated
                                                            regime, including drainage patterns, run-off      fencing where appropriate;
                                                            and water quality;                                AND
                                                       d) avoid crossing watercourses, drainage               S10.3 Road infrastructure within or adjacent to
                                                            lines and wetlands, but where such                native habitat incorporates fences which allow
                                                            crossings are unavoidable, disturbed areas        for protected wildlife movement and controls
                                                            are reinstated and revegetated on                 unrestricted access of domestic cats and dogs;
                                                            completion of works; and                          AND
                                                       e) minimise bulk earthworks.                           S10.4 Native vegetation is protected from
                                                                                                              clearing or construction activities by—
                                                                                                              a) clearly marking vegetation to be retained
                                                                                                                    with flagging tap;
                                                                                                              b) installing protective fencing around the
                                                                                                                    dripline of vegetation; and
                                                                                                              c) ensuring stock piling, storage and vehicle
                                                                                                                    parking occur outside the areas of
                                                                                                                    vegetation to be retained;
                                                                                                              AND
                                                                                                              S10.5 Low impact construction techniques are
                                                                                                              used around areas of vegetation to be retained
                                                                                                              to minimise interference with the vegetation.
                                                       O11 Roads and stormwater drainage                      No solution provided
                                                       infrastructure is proven to be suitable for its use
                                                       prior to Council accepting the dedicated asset.
                                                       O12 Alignment of stormwater drainage                   S12.1 The location, design and construction of
                                                       infrastructure is to allow for easy access for the     stormwater drainage structures is in accordance
                                                       ongoing maintenance by Council.                        with Sections 4 and 5 of PSP5, Engineering
                                                                                                              Design Standards - Roads, Drainage and
                                                                                                              Earthworks;


                                                                                                          14-154
                                                                                            Transport, Roads and Drainage Code
Log in to download the original file

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.