Original source · versioned page text
20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)
Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.
Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.
column 1 column 2
Including amendments to 8 June 2018
Specific Outcomes Probable solutions (if code assessment)
The Noosa Plan
AND
S12.2 Where infrastructure is located on private
land an easement is dedicated over the
infrastructure in accordance with Section 4 of
PSP 5, Engineering Design Standards – Roads,
Drainage and Earthworks.
14.147 Frontage works
O13 Development is provided with external S13.1 The following infrastructure components
roadworks along the full extent of the frontage of already exist at the frontage of the site or are
the site to an appropriate standard having provided at the developer’s expense—
regard to the specified function of the road. a) full width sealed road;
b) concrete kerb and channel where
appropriate;
c) forming and grading to footpaths;
d) vehicular kerb and footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed carriageway;
h) required alterations to public utility mains,
services or installations;
i) construction of any required alterations to
public utility mains, services or
installations;
j) stormwater drainage works; and
k) installation of electrical conduits;
AND
S13.2 Road and drainage design and
construction is in accordance with Sections 3
and 4 of PSP5 Engineering Design Standards –
Roads, Drainage and Earthworks.
14.148 Road and rail corridors
O14 Noise sensitive uses including residential S14.1 Noise sensitive uses including residential
uses are not subjected to high traffic noise uses are separated by a minimum of—
levels from the major road network or rail a) 40m from the property boundary of roads
corridors. within the major road network; and
b) 80m from the property boundary of rail
corridors;
OR
S14.2 Development in the vicinity of road
corridors meets the following external design
criteria for roads in the major road network—
a) 54dB(A)L10 (18hours) based on predicted
traffic volumes ten years hence;
AND
S14.3 Development in the vicinity of rail
corridors meets the following external design
level noise criteria—
a) 65dB(a), assessed as the 24hour
average equivalent continuous A-
weighted sound pressure level; and
b) 87dB(A), assessed as a single event
maximum sound pressure level.
14-155
Transport, Roads and Drainage Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.