20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1)

Attached to the e-mail Operational Works Application OPW20/0114 - Email 2 of 4 - Civil Plans - Community Titles Scheme Statement - BUP - Part 14 Assessment Benchmarks - 4 Portside Crt, Noosaville.

Attached to the e-mail RE_ Proprietary Products & Compliance with SQUIDEP.eml, inside BP Noosaville - overview of proposed stormwater quality strategy related discussions.msg.

of 192

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                  column 1                                             column 2




                                                                                                                             Including amendments to 8 June 2018
              Specific Outcomes                         Probable solutions (if code assessment)




                                                                                                            The Noosa Plan
Erosion and sediment control
O5 Development does not cause erosion or              No solution provided.
result in transport of sediments off-site.
                                                      Editor’s note:
                                                      Persons undertaking development, including
                                                      building work, are required under the Environmental
                                                      Protection (Water) Policy 1997 (EPP) to ensure that
                                                      sediment and other material including building
                                                      waste, sawdust, concrete, cement or paint are not
                                                      deposited or released into a roadside gutter,
                                                      stormwater drain or waterway, or into a place where
                                                      it could reasonably be expected to move or be
                                                      washed into a roadside gutter, stormwater drain or
                                                      waterway and are not washed from the site.
                                                      Council enforces the EPP and penalties may apply.

Safety and security
O6 For Multiple Housing Types 2, 3 and 4,             S6.1 The building entrance is clearly
buildings and outdoor spaces are designed to          identifiable and visible from the street, footpath
protect the personal security and safety of           and driveway;
residents by allowing for natural surveillance.       AND
                                                      S6.2 The internal path network has clear
                                                      sightlines to the dwelling entry and street
                                                      access points;
                                                      AND
                                                      S6.3 Visitors have direct access to the
                                                      entrance without passing through private
                                                      outdoor living areas.
Emergency access
O7 For Multiple housing Type 3, 4 & 5, site           No solution provided
design and layout ensures efficient access and
egress for emergency vehicles.
Basement drainage
O8 Buildings and access works are designed            S8.1 Enclosed car parking and manoeuvring
and sited to protect persons and property in the      areas are constructed at a level that permits
event of a flood and power failure.                   the parking area to drain from the site by
                                                      gravity means, without the need for
                                                      mechanical pumping.
Separation of incompatible uses
O9 Development is designed to minimise noise          S9.1 Bedroom windows are at least 3m away
carrying between dwelling units or                    from shared driveways or carparking areas of
accommodation units by locating noise sensitive       adjacent dwelling units or accommodation
spaces such as bedrooms away from noise               units.
generating areas of the development, such as
carparking areas or mechanic plant and
equipment or recreational facilities.




                                                14-47
                                         Residential Uses Code
Log in to download the original file

20181085-ASC7 - Part 14 Assessement Criteria (Codes) (1).pdf · 3.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.