ORDINARY MEETING MINUTES 17 OCTOBER 2024
11.1. CRAIG VELLA
QUESTION 1.
Noosaville Foreshore Infrastructure Master Plan (NFIMP) Project news Phase 1
March 2024 stated that 70% of 542 community favoured 'preserving or enhancing
the relaxed atmosphere and amenity' of the Noosaville foreshore. The draft shared
vision stated, “Our vision is for the Noosaville Foreshore to be retained as a
peaceful, relaxed, and naturally beautiful public space that is easily accessible for
all” & "while keeping built form structures to a minimum". Has the Noosa Council
worked out how the NFIMP 80% Draft Plan ended up so far off course given all
this information gathered from the community in phase 1?
Response provided by Acting Director Infrastructure Services, Shaun Walsh
Thank you for the question and interest in the Noosaville Foreshore. The
community had differing reactions to the draft Noosaville Foreshore Infrastructure
Master Plan. Most certainly did not appreciate the loss of carparking, overly
modern design approach, concerns for the erosion management techniques as
well as concerns for proposed changes to the tennis court and other
spaces. Others in the community appreciated the widening of footpaths to make
them safer, the new proposed toilet block, refreshed playground equipment and
the natural approach to Chaplin Park.
It is noted that whilst the design approach of the draft was modern, it did embrace
a significant increase in open space through repurposing of carparks, improved
accessibility with improved cycling and walking paths, and any new structures
were limited to parks shelters and playground. Ultimately it is noted the proposal
to increase open space through repurposing of carparks has not met community
satisfaction and this in being addressed in the revised Master Plan.
Master Planning can be a difficult process to ensure appreciation of the issues and
community consensus on the design direction moving forward. Council deeply
respects the strong community sentiments surrounding the proposed draft Master
Plan. Council have listened and acknowledge that an updated draft is needed that
responds to community views, and are using the feedback to draft a revised Master
Plan, in particular a strong desire to maintain the relaxed Noosaville vibe we all
know and love.
QUESTION 2.
Did the Noosa Council use the same consultants to produce the redrafted
Noosaville Foreshore Infrastructure Master Plan, and did the consultants, provide
a discount, given the original had to be redrafted?
Response provided by Acting Director Infrastructure Services, Shaun
Walsh
Noosa Council used the same consultants, Tract Consultants, to continue the
ongoing work. Tract Consultants were originally selected for the project following
a competitive pricing process. Their price for the ongoing work was determined
following a period of commercial negotiation, and is considered to be a
competitive market price.
11.2. ANDREW MCCARTHY
QUESTION 1.
How much did the Noosaville Foreshore Infrastructure Master Plan and Concept
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.