Planning Report 60500
Attached to the e-mail Lot Reconfiguration - Eagle Drive and Tait Street Tewantin REC17/0011.
4.1.4 Services
Given that the subject site is situated within an urbanised area, it is currently
provided with access to all urban infrastructure services, including:
Reticulated wastewater infrastructure;
A reticulated supply of water;
A reticulated supply of electricity;
A reticulated supply of telecommunications; and
Reticulated stormwater drainage infrastructure.
The proposed new allotments will be provided with connection to all of the
abovementioned urban infrastructure services with ease. Detailed civil drawings
depicting the extension/provision of services to each lot will be lodged with
Council as part of a subsequent Operational Work stage.
4.1.5 Stormwater Management
Lot 3 on RP149498 and Lot 31 on RP149497 have been included in this application
for the purposes of stormwater management. Consent from the Current Registered
Landowners has been obtained from the owners of both properties (refer to
Appendix A for copies of the Current Title Searches) by signing the Individual
Owner’s Consent Forms which are attached to IDAS Form 1 – Application Details (for
Lot 31 on RP149497) and by signing an Agreement for Easement Arrangement (for
Lot 3 on RP149498).
The proposed development combined with the natural fall of the land will result in
overland stormwater flow running from east to west over the site along two (2)
different paths. The first path of overland stormwater flow exits along the western
boundary of the current Lot 6 on RP149498 to traverse the southern boundary of Lot
3 on RP149498 to the legal point of discharge along Tait Street. For this reason, the
application proposes the registration of a 1.5m wide easement for the purposes of
stormwater discharge along the southern boundary of Lot 3 on RP149498.
The second path of overland stormwater flow exits the southern boundary of Lot 6 on
RP149498 and is proposed to be captured in the dedicated Drainage Reserve Lot 100
(currently Lot 31 on RP149497). See Appendix D – Drainage Basin Masterplan for
details.
12
Planning Report 60500 Murray & Associates (Qld) Pty Ltd March 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.