Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Performance outcomes                      Acceptable outcomes                                               Response     Comment
                                          optimal minimum release for fish way operation.
                                          And
                                          AO14.5 The fish way is designed such that non-operation           N/A          Refer to Response AO12.1.
                                          duration (for example, less than two weeks) and incidents
                                          due to maintenance issues (for example, siltation, debris,
                                          breakdowns, sourcing of parts) are minimised.
                                          And
                                          AO14.6 Fish ways are monitored and maintained to                  N/A          Refer to Response AO12.1.
                                          ensure that the fish way is operational at all times.
PO15 Any fish way, and all associated     AO15.1 Development ensures that mechanisms are in                 N/A          Refer to Response AO12.1.
componentry are designed to be durable,   place to ensure that operational issues in fish ways are
reliable and adequately protected from    promptly rectified for the life of the fish way.
damage from high flow and flood events,   And
to prevent or minimise non-operation.
                                          AO15.2 The quality of materials and components for                N/A          Refer to Response AO12.1.
                                          construction of the fish way are appropriate for the
                                          intended service life of the fish way.
PO16 Any fish way is located in a         AO16.1 Modelling demonstrates, by showing the likely              N/A          Refer to Response AO12.1.
position and manner that maximise the     flow patterns and adjacent to the fish way entrance that
attraction and movement of fish, while    the location of the fish way entrance is optimal for fish
also enabling access for monitoring,      attraction across the operational range of the fish way.
maintenance and operating purposes.       And
                                          AO16.2 Outlet works are adjacent to the fish way, but are         N/A          Refer to Response AO12.1.
                                          positioned and designed so as not to interfere with fish
                                          access and attraction to the fish way entrance during
                                          outlet releases.
                                          And
                                          AO16.3 Spillway overtopping flows initiate and terminate          N/A          Refer to Response AO12.1.
                                          adjacent to the fish way or are directed parallel to the fish
                                          way entrance.
                                          And
                                          AO16.4 Spillway flows are transferred to fish way                 N/A          Refer to Response AO12.1.
                                          releases as soon as possible during a flow recession.
                                          And
                                          AO16.5 There is a continuous attraction flow at all times         N/A          Refer to Response AO12.1.
                                          at the fish way entrance when the fish way is operating.
                                          And


State development assessment provisions                                    Module 5 — Fisheries resources          5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9                                                                                                                                                                   Page 9 of 24
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.