This timeline uses NoosaWatch’s attributed transcript times on its own subtitled recording. It does not assign speech to agenda items. Drag across the timeline to choose a window, or use the start/end controls. Select a speech block to watch that actual segment. Chairing and procedural speech are included; airtime is not a measure of impact.
Timeline axis: hours:minutes on the local recording. Transcript version 31fa5817a802ce9a · the chart and record list below use the same selected time window. Segment text is supplied in full for context, even when only part of its duration contributes.
Filter and investigate these records
Named speaking time by Person
Named speaking time
Speaking time for each named speaker in the selected meetings, with overlapping passages counted once. Topic and item filters select whole meetings; these times do not measure an individual item’s discussion. Select a bar to inspect its records. Seconds use the selected local window where set, and include speech unallocated to agenda items.
I declare the meeting open and wish to acknowledge the Kabi Kabi people, the Traditional Custodians of this land, their elders past, present and emerging. We are all in attendance but we have Councillor Finzel and Councillor Lorentson atten
That's it. Thank you. Council is in receipt of an application for a change to a for Material Change of Use, home-based business, meat processing facility at 82 Patterson Drive, Tinbeerwah. The change request relates to a number of the devel
Yes, thank you for the report, Andrew. The change doesn't represent an intensification of use on site, does it? That's right. So still 10 deer per week?
That's correct. We have extended it out. By four years, so a longer period than what was previously allowed. But noting the change that's proposed, just to ensure that there's no complaints.
And during the previous two-year trial period, there were complaints lodged. Could you tell us about the you findings? When you investigated the complaints.
Um there was were some issues raised around some landscaping, that it wasn't comprehensive enough in terms of what was required, so there was further landscaping that had been undertaken and signed off earlier last year. There's also been s
Thank you. Other questions? No? My only question then is, under the State law now it's a code-assessable application, I can't think of an instance where we have time limited a code-assessable application. I just wonder the merits if we have