This timeline uses NoosaWatch’s attributed transcript times on its own subtitled recording. It does not assign speech to agenda items. Drag across the timeline to choose a window, or use the start/end controls. Select a speech block to watch that actual segment. Chairing and procedural speech are included; airtime is not a measure of impact.
Timeline axis: hours:minutes on the local recording. Transcript version 32a86e7b9a434257 · the chart and record list below use the same selected time window. Segment text is supplied in full for context, even when only part of its duration contributes.
Filter and investigate these records
Named speaking time by Person
Named speaking time
Speaking time for each named speaker in the selected meetings, with overlapping passages counted once. Topic and item filters select whole meetings; these times do not measure an individual item’s discussion. Select a bar to inspect its records. Seconds use the selected local window where set, and include speech unallocated to agenda items.
We can abide in connection to this country. We recognise the Kabi Kabi people as the Traditional Custodians of the lands and waters of the Noosa area and offer gratitude for their careful custodianship of this unique environment over thousa
There are no presentations and no deputations. So let's move to item five, reports for consideration in the committee. Firstly, item one, Maritime Safety Queensland recreational facilities demand forecast study 2022. Can I ask, are there an
Sure. Thank you, this is a joint report, both with environment and infrastructure. The report provides an overview of the recreational boating facilities demand forecast study 2022, 2022, which was commissioned by the Maritime Safety Queens
So we did have a project initiation put up this year to look at this foreshore area as in a master plan however it was unsuccessful but we are looking at master planning this foreshore area and what we also do is this year to look at the No
Yeah, yeah, and I think it's part of the yeah, loose. River catchment management strategy as well. We should be considering infrastructure in that moving forward. There is funding available, as you know, through the Council of Mayors for th
In the report that they hadn't gone through, you've reported they haven't gone through the proper due diligence in regard to the capacity, you know they're saying 40 car parks could fit here but that's not taking into account engineering st
There's nothing currently in the forward design program and there's nothing currently budget in 10-year capital works program to look at improving boat trailer parking. We're looking at a potential 30 million dollar capital works program th